Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/15/2020 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by JSCHNEI2 - Approved. |
| 08/12/2020 |
ENGR Engineering Final
|
RLEDONNE |
Approved |
Entered by JSCHNEI2 - Approved. |
| 08/06/2020 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by RSALDAT1 - Partial approval. OK for TCO only. Complete all work on approved plans for final. |
| 08/03/2020 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by RSALDAT1 - Partial approval. Complete all notes from last inspection for final.
|
| 07/27/2020 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by JSCHNEI2 - Partial approval. OK forTCO only. Complete all riprap stabilization of disturbed soil.
|
| 07/17/2020 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Complete sidewalk on east side of building six. Provide sidewalk scuppers for roof drains on east side of building one. Checked ADA parking all slopes OK move van accessible sign to the south went over with GC. Checked sidewalk slopes On south side of building and East side of building from ADA parking to the south. Remove all construction debris and materials from sidewalks to be able to check all slopes. |
| 07/15/2020 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by JSCHNEI2 - Not ready. Have all construction materials removed from pedestrian pathway and ADA parking to check grades before calling for final inspection. |