Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2020 |
SITE - Stormwater Follow-up
|
Rledonne |
Approved |
Entered by RLEDONN1 - |
| 09/09/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by JSCHNEI2 - Continue. Walks site with superintendent went over corrections that need to be made on site.
|
| 04/29/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RSALDAT1 - NO CONCERNS |
| 04/08/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by RSALDAT1 - CONTROLS NEED T BE ADDED TO ON SITE CONCRETE MIX PLANT. |
| 02/26/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by SFLORES2 - No concerns at this time. |
| 02/11/2020 |
SITE - Stormwater Follow-up
|
RLEDONNE |
Continued |
Entered by DMERANZ1 - Making repairs to stormwater controls on east and west side of site. |
| 10/29/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Stop by to see general contractor about calling in every two weeks for inspections. |