Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - DP18-0283
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2025 | Partial Pass | Contractor can pour the wedge curb north of the building about 200 lineal feet plus or minus | ||
| 05/07/2025 | Partial Pass | Contractors good for the sidewalk on the north end of the buildings | ||
| 05/28/2025 | Partial Pass | Contractors grading the road on the north end of the buildings installing a B and will get compaction on it at 100% | ||
| 07/23/2024 | Not Ready | Form setters had started and have not returned yet. They will schedule before pouring concrete. | ||
| 08/13/2024 | Partial Pass | Good to pour the handicap ramp on the south west side of the property | ||
| 08/26/2024 | Partial Pass | Contractor poured the axis ramp on the corner of 17th and eighth north west corner | ||
| 09/25/2025 | Re-inspection required | Slope and cross-slope issues need to be addressed. | ||
| 11/15/2024 | Partial Pass | The section at the west end where ramp meets street is good to pour. The next section to the east will need to also be replaced in front of the stand alone home as it also has been damaged in construction and will be part of the new accessible sidewalk on the south side. The entire south side walk needs to be revised on plan and submitted to the city review process. The once existing sidewalk had been removed due to construction damage. Note; new revision needs to meet the accessible design standards for ADA compliance. |