Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
06/03/2020 ENGR Grading Final RLEDONNE Approved Entered by RSALDAT1 -
10/11/2019 ENGR Grading Final RELDONNE Not ready for Inspection Entered by DMERANZ1 - no work on site at this time.
06/12/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
06/12/2020 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
06/18/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 - Approved Amy with Caylor on site. Chuck with Caylor at 237-8609 Streets are public. The trees are on private property. Chuck with Caylor insists that SWPPP has been terminated in the letter of compliance of grade has been submitted to the city.
11/24/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. No grading activity on site at this time.
10/27/2020 ENGR Grading Final RLEDONNE Continued Entered by PAHUMAD1 - Continue. No grading activity at this time working on houses.
09/15/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. No grading activity working on houses.
06/09/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue no grading activity at this time.
06/03/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Working on completing all landscaping and riprap on site.
03/24/2020 ENGR Grading Final DROBERTS Continued Entered by SFLORES2 - MET WITH AMY AND CHUCK AND LOOKED OVER THE SUBDIVISION TO SEE IF THERE WERE ANY CONCERNS. I HAVE NOTED THE FOLLOWING AT THIS TIME THAT THEY WILL ADDRESS PRIOR TO THE NEXT SITE VISIT: 1) THE SITE DOES NOT HAVE A CONCRETE WASHOUT AREA DESIGNATED WITHIN THE PROJECT LIMITS. CURRENTLY THEY ARE WASHING OUT THE CEMENT TRUCKS IN AN AREA NORTH OF THE HAMMER HEAD DIRECTLY ON A LOT. I HAVE ADVISED THEM THAT THIS IS A VIOLATION OF THEIR SWPPP’S AND NEEDS TO BE CORRECTED. 2) THE BASIN LOCATED AT THE NORTHWEST CORNER OF THE SITE IS CURRENTLY HOLDING WATER PAST THE MAXIMUM ALLOWED TIME OF 12 HOURS. I HAVE ASKED THAT THEY ADDRESS THIS ISSUE WITH KEVIN HALL FROM CYPRESS ENGINEERING TO FIND A LONG TERM AND SHORT TERM SOLUTION BEFORE WE COMPLETE THIS PROJECT. 3) THE DEVELOPER IS INSTALLING PLANTS ATTHIS TIME AT VARIOUS LOCATIONS THROUGHOUT THIS SITE, BUT NONE OF THEM ARE ON THE APPROVED LANDSCAPE PLAN. THEY WILL BE CONTACTING ANDREW CONNOR AND SEE IF THEY WILL BE ABLE TO ELIMINATE THE TREES THAT ARE SHOWN IN THE BASIN AREA FOR THE OVERAGE OF TREES THAT THEY WILL BE PLANTING FOR EACH OF THE LOTS. THE SIDEWALK FOR THIS SITE IS BEING DONE BY THE TRANSPORTATION DEPARTMENT SINCE THESE ARE PUBLIC STREETS. I HAVE POINTED OUT SOME AREAS THAT MAYBE QUESTIONABLE IN REGARDS TO THE 2% CROSS SLOPES, THEY WILL RE-EVALUATE THESE AREAS PRIOR TO THE FINAL ACCEPTANCE OF THIS SUBDIVISION. ADDITIONAL INSPECTIONS OF THIS SITE WILL BE MADE TO ENSURE THAT ALL ASSURABLE ITEMS HAVE BEEN PROVIDED AS SHOWN ON THE APPROVED PLANS FOR THIS SUBDIVISION.
10/11/2019 ENGR Grading Final RELDONNE Continued Entered by DMERANZ1 - Rough grading Basin Street and house pad.