Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 02/17/2023 |
ENGR Engineering Final
|
|
Not Ready |
Complete the work as we discussed call visiting the project which will include the installation of the asphalt pavement in the northern parking lot Area as well as the driveway access into the parking lot. |
| 04/05/2024 |
ENGR Engineering Final
|
|
Passed |
Railing for building (5) completed, all turf areas completed, and scupper locations thru out site requested by Dave Robert’s have been completed. |
| 04/18/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Handicap parking in front of apartment 1111 is noncompliance trees need to be staked DG needs to be in place roof drainage needs to be turned So the water doesn’t run onto the sidewalk |
| 06/28/2024 |
ENGR Engineering Final
|
|
Passed |
|
| 07/20/2023 |
ENGR Engineering Final
|
|
Partial Pass |
landscape is not complete. OK for TCO for building four and five, level 1 2,3 |
| 07/20/2023 |
ENGR Engineering Final
|
|
Passed |
landscape is not complete. OK for TCO for building four and five, level 1 2,3 |