Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP18-0184

Parcel: Unknown


Addresses:

9300 E VALENCIA RD

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
09/08/2021 ENGR Grading Final MHERNANDEZ Approved Entered by RSALDAT1 - APPROVED
09/01/2021 ENGR Grading Final MHERNANDEZ Partial Approval Entered by RSALDAT1 - PARTIAL
08/23/2021 ENGR Grading Final MHERNANDEZ Partial Approval Entered by RSALDAT1 - PARTIAL
04/14/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
11/24/2020 ENGR Grading Final RLEDONNED Continued Entered by PAHUMAD1 - Continue. No grading activity on site at this time.
11/06/2020 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - IS CONTINUED AT THIS TIME, WORK ON SITE AT THIS TIME IS MAINLY VERTICAL ON THE BUILDINGS, AND SITE WORK AROUND BUILDING PERMIT T19CM04078 & T19CM05403 THAT HAVE BEEN REQUESTED FOR A TCO ON THIS DATE.
10/30/2020 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED AT THIS TIME, CREWS WORKING ON LANDSCAPING ITEMS IN AREAS WHERE THEY WILL BE SEEKING A TCO IN THE FUTURE. ALL OTHER WORK ON THIS SITE MAINLY CONTINUES ONTHE REMAINING STRUCTURES GOING VERTICAL.
10/19/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue.Complete all work around building 14 including landscaping all work overhead concrete work All work on approve plans. Provide physical separation from construction and the public.ADA parking over 2% walk site with GC went over work that needs to be completed.For TCO for building 14.
09/22/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Working on drainage way on north side of site.
09/15/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue. Photos sent by grading contractor for welded wire installed in drainage into North East basin from Onsite Road.
08/03/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Grading parking and roadways on southwest side of site.
05/29/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Met with grading contractor on site talked about ADA parking and pathways. Went over pinchpoints and curb openings.
01/14/2020 ENGR Grading Final RLEDONNE Continued Entered by DMERANZ1 - Installing storm water piping inspection per highlights on development package page 20 and 21.
09/08/2021 ENGR Grading Final MHERNANDEZ Approved Entered by RSALDAT1 - APPROVED
09/01/2021 ENGR Grading Final MHERNANDEZ Partial Approval Entered by RSALDAT1 - PARTIAL
10/20/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Trash enclosures on south east and north east side of site ready for final grout.
09/24/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Walls for trash enclosure at North East and north south end of site. First grout left OK.
07/30/2020 ENGR Grading Final RLEDONNE Continued Entered by JSCHNEI2 - Continue inspection done by pictures. Headwall for basin on north east side of site. Per pipe culvert head wall inlet outlet Without pipe is the detail contractor went by.
07/29/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Footer for trashing closure south of building nine OK. OK to grout Walls for trash enclosures south of building 13 and 12.
07/16/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Rebar four footer for trashing closure south east of building#6 Footer OK only. FaceTime inspection.
07/07/2020 ENGR Grading Final RLEDONNE Partial Approval Entered by JSCHNEI2 - Partial approval. Inspection for monument signs setback only. Observation only information per redlines not COT approved plans. Talked with GC about calling me back with approved sign plans under that permit to verify information decision for sign still with Review board.
06/17/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Rebar OK in trash and closure walls for building 15 and 16 in wall only.
05/28/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. FaceTime inspection with general contractor for trash enclosures at buildings. #13,15 &16.Rebar in walls for first 4 feet left. OK.
05/19/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Trashing closure north east of building number 16 footer OK Per photos sent by general contractor.
05/14/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Continue. Footer for trash enclosure on south side of building number 13 OK.
04/29/2020 ENGR Grading Final RLEDONNE Continued Entered by RSALDAT1 - Rebar for footers in trash enclosures for buildings #12 & #15 okOnly.
02/04/2020 ENGR Grading Final DROBERTS Denied Entered by DMERANZ1 - Have advised the contractor to provide us with a certification letter from the engineer of record stating that all journeys structures have been constructed per the approved plans since a visual inspection was not done on them.
09/10/2021 ENGR Grading Final MHERNANDEZ Not Applicable Entered by VVERA1 - NA
07/18/2019 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO ACTIVITY AT THIS TIME.
07/09/2019 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO GRADING ACTIVITY ON SITE.
09/10/2021 ENGR Grading Final MHERNANDEZ Approved Entered by VVERA1 - APPROVED