Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 11/14/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by DMERANZ1 - No work shown on city approved existing site plan. |
| 11/13/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Caldwell construction Pauline, Adam, Renee. Has recently inherited this project and will obtain a set of approve plans and call for inspection when ready. Engineering needs to verify that all work has been completed as shown on city approved Site plan |
| 11/12/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Could not locate contractor with Caldwel construction. No message was provided. There appears to be ongoing work in two locations on the site. Only plan in Provo is a 2008 site plan. Please provide contact information when rescheduling this inspection provide plans for new work to be inspected. |