Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/09/2019 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by VFLORES1 - |
| 03/18/2019 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by CBELL1 - Currently the contractor is working on building the roadway and other exterior work. I will also look at the trash enclosures at a later date after it has been scheduled for an Inspection, the trash enclosures are undersized at this time. I have asked the contractor to provide me with an email from Environmental Services noting that they are accepting the trash enclosures in their current condition. |
| 05/16/2019 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/16/2019 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 05/16/2019 |
ENGR Grading Final |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 03/27/2019 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by CBELL1 - Matt rebar for trash enclosures OK |
| 02/13/2019 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by CBELL1 - Rebar in trash enclosure walls OK only call back for Matt |
| 01/25/2019 |
ENGR Grading Final |
RLEDONNE |
Continued |
Entered by CBELL1 - Trash enclosure footer OK per seat per city of Tucson detail. Footer for screen wall per approved plan. OK to look at screen wall per Armando |