Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2019 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 06/05/2018 |
SITE - Stormwater Setup and Controls |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - THE CONTRACTOR HAS PLACED STORM WATER CONTROLS AROUND THE SITE EVEN THOUGH THEY ARE LESS THAN AN ACRE. THEY HAVE A TRACKOUT AREA LOCATED ON THE NORTH SIDE OF THE SITE LEADING OUT ONTO SPEEDWAY BLVD. THEY HAVE CONCRETE WASHOUT BINS ON THIS SITE THAT ARE BEING UTILIZED. I HAVE ADVISED THEM THAT THEY HAVE SOME AREAS WHERE THE CONCRETE HAS OVER FLOWED FROM THE BINS AND IS IN DIRECT CONTACT WITH THE SOIL, THESE AREAS NEED TO BE CLEANED UP BY MY NEXT VISIT |