Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP17-0301
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/03/2019 | ENGR Engineering Final | DROBERTS | Approved | Entered by DMERANZ1 - |
11/20/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - 2.3% slope at stair landing. Corrected parking space has not been restriped. The space was checked in a couple places and appears to be good however there are tools and Plastic covering the space. |
11/14/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DMERANZ1 - COMPLETE ALL REPAIRS ON THE ADA PARKING SPACE AND ACCESS AISLE ON THE 1st FLOOR OF THE PARKING STRUCTURE PRIOR TO CALLING IN FOR THE FINAL INSPECTION FOR THIS SITE. |
10/29/2019 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DMERANZ1 - COMPLETE ALL WORK ON THIS SITE PER THE APPROVED PLANS PRIOR TO REQUESTING ANY ADDITIONAL INSPECTIONS. A RE-FEE WILL BE REQUIRED FOR ALL INCOMPLETE WORK ON THIS SITE. |
10/10/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Accessible parking on lower level exceeds maximum allowed slope also re-stripe. after correcting. Antonio 602-292-0989. Provide city of Tucson with SWPPP termination. |
08/16/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Inspection with Dave Roberts, we checked the lower accessible parking spaces, they are out of compliance and require correction. |
08/05/2019 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DMERANZ1 - NO OCCUPANCY (LIVING)(STOCKING ONLY). AT THIS TIME THE CONTRACTOR HAS TWO LIFT UNITS IN THE PARKING GARAGE UPPER LEVEL, IN THE ADA PARKING SPACES REPAIRING THE ROOF WRAP. ALSO ONE LIFT UNIT AT THE NORTH EAST CORNER PERFORMING OVER HEAD WORK ABOVE THE SIDEWALK. CURRENTLY I WAS ABLE TOO CHECK THE SLOPE OF THE ADA PARKING SPACES IN THE GARAGE AREA. THE ACCESS AISLE IS OUT OF COMPLIANCE ON THE CROSS SLOPE, THE PARKING SPACE APPEARS TO BE WITHIN TOLERANCE. THIS MAY CHANGE PENDING ON WHAT THE ENGINEER OF RECORD FOR THIS SITE DETERMINES HOW THE REPAIRS ARE TO BE MADE. ON THE SECOND LEVEL THE PARKING SPACES AND ACCESS AISLES ARE ALL NON COMPLIANT. THE CONTRACTORS REPRESENTATIVE HAS BEEN NOTIFIED OF THE ISSUES AT HAND. |
08/02/2019 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DMERANZ1 - IS OK FOR TCO FOR OCCUPANCY PENDING ALL OTHER REQUIRED INSPECTIONS. FINAL NOT TO BE GIVEN TILL ALL OF THE WORK ON THE EXTERIOR OF THI SITE IS COMPLETE. THIS WILL INCLUDE BUT IS NOT LIMITED TO: 1) HANDRAIL PLACEMENT, 2) GLASS INSTALLATION AS REQUIRED FOR MISSING OR DAMAGED WINDOWS, 3)INSTALLATION OF METAL WALLS AND ALL OTHER ITEMS AS NEEDED, 4) INSTALLATION OF MISSING OR BROKEN TILES, GENERAL SITE CLEANUP, 5) COMPLETE ALL ADA PARKING LOCATIONS WITHIN THE PARKING STRUCTURE. |
07/29/2019 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DMERANZ1 - SEE THE NOTES FOR GRADING INTERMEDIATE. |
07/25/2019 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DMERANZ1 - CREWS ARE STILL WORKING ON THE NORTH, EAST, AND WEST SIDES OF THIS SITE ON SITE WORK. THERE IS STILL A DRAINAGE CONCERN IN THE ALLEY ON THE WEST SIDE OF THE BUILDING APPROXIMATELY 50 TO 75 FEET SOUTH OF THE NORTHWEST CORN. THE ROOF DRAINAGE LINES AND THE CURRENT SLOPE GRADES IN THE ALLEY ALLOW THE WATER TO DRAIN BACK TOWARDS THE DOOR OPENINGS. I HAVE BEEN ADVISED BY THE CONTRACTOR THAT THEY HAVE AN RFI INTO THE ENGINEER OF RECORD FOR THIS CONCERN, THEY ARE WAITING FOR HIS RESPONSE. |
07/19/2019 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by VFLORES1 - Provide a notice of termination for SWPpp, stake trees, Complete the work. Correct the drainage problem west side of the building. |
07/15/2019 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Engineering has no issues that would prevent a temporary certificate of occupancy for stocking and furniture, ffor all levels of the building, provided that subcontractors can enter the front of the building with a lane closure permit in place. Provide an engineer fix for the rainwater issues on the north west side of the building and alley. Water is crossing in emergency exit and running back into the parking garage due to improper grading of the alley. |
12/03/2019 | ENGR Engineering Final | DROBERTS | Approved | Entered by DMERANZ1 - |
11/20/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - 2.3% slope at stair landing. Corrected parking space has not been restriped. The space was checked in a couple places and appears to be good however there are tools and Plastic covering the space. |
11/14/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DMERANZ1 - COMPLETE ALL REPAIRS ON THE ADA PARKING SPACES AND ACCESS AISLE ON THE 1st FLOOR OFTHE PARKING STRUCTURE PRIOR TO CALLING IN FOR THE FINAL INSPECTION FOR THIS SITE. |
10/29/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DMERANZ1 - PROVIDE US WITH THE CLOSEOUT DOCUMENTATION PRIOR TO SCHEDULING ANOTHER INSPECTION. THIS DOCUMENTATION IS AS FOLLOWS: CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR ALL COMPLETED WORK, NOTICE OF TERMINATION FROM ADEQ FOR THIS SITE, APPROVED REVISED DRAWINGS FOR ANY AND ALL CHANGES THAT WERE NOT ON THE ORIGINAL PLAN. |
10/10/2019 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by DMERANZ1 - Accessible parking on lower level exceeds maximum allowed slope also re-stripe. after correcting. Antonio 602-292-0989. Provide city of Tucson with SWPPP termination. |
08/07/2019 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - 9160 (STORMWATER FINAL INSPECTION) NOT READY AT THIS TIME, COMPLETE ALL WORK ON SITE AND PROVIDE THE CITY OF TUCSON WITH ALL CLOSEOUT DOCUMENTATION FOR THIS PERMIT 9027 (ENGINEERING - FINAL) OK FOR A TEMPORARY CERTIFICATE OF OCCUPANCY FOR THIS SITE PENDING ALL OTHER INSPECTIONS. THIS SITE STILL HAS UNRESOLVED ISSUES CONCERNING THE ADA PARKING AND ACCESS AISLES IN THE PARKING STRUCTURE THAT WILL NEED TO BE RESOLVED PRIOR TO THE FINAL APPROVAL. |
07/15/2019 | ENGR Engineering Final | BBENEDON | Partial Approval | Entered by DMERANZ1 - Engineering has no issues that would prevent a temporary certificate of occupancy for stocking and furniture, ffor all levels of the building, provided that subcontractors can enter the front of the building with a lane closure permit in place. Provide an engineer fix for the rainwater issues on the north west side of the building and alley. Water is crossing in emergency exit and running back into the parking garage due to improper grading of the alley. |