Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 01/23/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/21/2020 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/05/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Partial Approval |
Entered by DMERANZ1 - THE CONTRACTOR IS WORKING ON THE SOUTH PORTION OF THE PROJECT ROUGH GRADING THE AREA. I WILL DISCUSS THE ONGOING WORK WITH JOHN VAN WINKLE TO ENSURE HOW MUCH OF THE AREA NEEDS TO HAVE HYDRO SEED OR DG PLACED ON IT FOR A FULL CLOSURE OF THIS PERMIT. |
| 05/02/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Contractor is installing landscape in the north and northwest portion of the site. |
| 03/05/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Approved |
Entered by DROBERT5 - ALL REMAINING ITEMS WILL BE ADDRESSED UNDER DP17-0142 |
| 01/23/2019 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - CREWS WORKING ON THE INSTALLATION OF PLANTS THROUGHOUT THIS SITE |