Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/15/2018 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 05/08/2018 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - PRE-TCO INSPECTION OF THE SITE TO VERIFY WHAT IS NEEDED PRIOR TO REQUESTING A TCO NEXT WEEK. |
| 05/25/2018 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 05/15/2018 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - AWAITING CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD AND COMPLETE LANDSCAPING - CALL FOR RE-INSPECTION |
| 05/03/2018 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) PREP FOR PAVING - SUB GRADE OK
2) RE-BAR FOR DRIVE THROUGH - OK
3) ENSURE PEDESTRIAN ACCESS FROM CAMPBEL MEETS ADA |