Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP17-0052

Parcel: 14043013B


Addresses:

1151 E HERMANS RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP17-0052

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/31/2019 ENGR Grading Final DROBERTS Approved Entered by CBELL1 -
06/21/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED OVER THE FORMED SIDEWALK THAT THE HAVE ALONG THE NORTH SIDE OF THE WESTERN MOST BUILDING NEAR THE AREA OF A DROP-OFF ZONE. I WILL BE CHECKING WITH THE ZONING AND ENGINEERING REVIEWERS TO SEE IF SOME OF THE TRUNCATED DOME AREAS CAN BE ELIMINATED, IF SO IT WILL REQUIRE A REVISION TO THE PLANS FOR THIS SITE.
01/31/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/02/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - OK TO THE CONCRETE AT THIS TIME
07/18/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - APPROVED THE SIDEWALK AND RETAINING WALL FOR THE POUR TOMORROW MORNING
06/20/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THIS INSPECTION WAS COMPLETED ON 6/19/18
06/19/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - APPROVED THE REBAR FOR THE POURING OF THE SLABS FOR 2 TRASH ENCLOSURES
06/08/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE TRASH ENCLOSURE ON THE CENTRAL NORTHSIDE OF THE SITE, IT IS APPROVED AT THIS TIME FOR THE PLACEMENT OF GROUT.
05/31/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - TRASH ENCLOUSER ON EAST SIDE OF BUILDING REBARS IN WALLS AND BOND BEAM OK ONLY.
05/29/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - INSPECTED THE OUTLET STRUCTURES ON THE NORTHSIDE OF THE PARKING LOT ON THE EAST SIDE OF THE NEW CONSTRUCTION, AREA OK FOR THE PLACEMENT OF CONCRETE.
05/18/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - TODAYS INSPECTION IS FOR THE DRAINAGE STRUCTURES LOCED ON THE NORTH SIDE OF THE PARKING LOT FOR THIS SITE. THE CREWS HAVE PREPARED THE WESTERN STRUCTURE WITH THE FORMS AND THE REBAR. THE CENTRAL AND EASTERN STRUCTURES HAVE BEEN FORMED UP, BUT THE REBAR HAS NOT BEEN INSTALLED AT THIS TIME. I HAVE ADVISED THE CONTRACTOR TO TAKE PHOTOS OF THE COMPLETED REBAR PLACEMENT AND SEND THEM TOO ME, OR HE CAN CALL IT IN FOR NEXT WEEK.
04/24/2018 ENGR Grading Final RLEDONNE Partial Approval Entered by RLEDONN1 - OK FOR VISTOR CENTER ONLY.
03/27/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - REBAR FOR WALL OK.
03/26/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - COMPLET INSTALLING VERT REBARS AT 32'' FOR TRASH ENCLOSURE. AT VISTOR CENTER.
03/19/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - TRASH ENCLOSURE FOOTER OK ONLY.
03/09/2018 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by RLEDONN1 -
11/01/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - RETAINING WALL PER HIGH LIGHTS ON PAGE CI.S03 AND S04
11/07/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - per high light on page ci.s04 wall.
11/03/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PER HIGH LIGHTS FOR WALL ON PAGE CI.S04.
10/31/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 -
10/27/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - RETAINING WALL PER HIGH LIGHTS ON PAGE CI.S03.
10/26/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 -
10/25/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 -
10/24/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 -
10/23/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PER HIGH LIGHTS ON PAGE CI.S03 & CI.S04.
10/19/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - ADD 160' TO HIGH LIGHTS ON PAGE CISO3.
10/17/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - ADDED TO HIGH LIGHTS ON PAGE CI503 80'.
10/16/2017 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE CI503 FOR RETAINING WALL.
03/20/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
03/20/2019 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
01/14/2019 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - THE INSPECTION CALLED IN TODAY WAS FOR THE CHECKING OF THE ADA COMPLIANT HANDRAIL THAT WAS CHECKED ON 1/11/2019
01/14/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE SITE ON MONDAY TO SEE HOW THE RAIL WAS GOING, THEY HAVE REMOVED THE UPPER RAIL AND WILL BE ADDING ANOTHER PIPE AT 36 INCHES ABOVE THE ADJACENT SIDEWALK, AS WELL AS A KICK PLATE AT THE BOTTOM.
01/17/2019 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - MET WITH THE CONTRACTOR AND DISCUSSED WHAT IS NEEDED WITH HANDRAIL FOR THIS SITE IF IT IS IN AN AREA THAT EXCEEDS 5% RUNNING SLOPE. THE CREWS HAVE CONSTRUCTED BARRIER RAIL WITH NO KICK PLATES, AND THE RAIL IS SET AT 42 INCHES ABOVE THE ADJACENT SIDEWALK. THE CONTRACTOR WILL BE ADDING ANOTHER RAIL AT THE 36 INCH HEIGHT AND WILL BE INSTALLING ANOTHER RAIL TO BE LOCATED LESS THAN 4 INCHES ABOVE THE SIDEWALK.
12/19/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - I spoke with Gerald about to rain gutter issues. He will replace a section of concrete with rocks and complete gutters where necessary. The city will not require a correction for the small canopy.
11/08/2018 ENGR Grading Final BBENEDON Not ready for Inspection Entered by CBELL1 - Ron and I met with Tim about questions he has about Rainwater Crossing accessible walkways and parking spaces. We suggested gutters under the sidewalk and approval from his engineer to make the corrections.
10/30/2018 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Temporary fencing has been installed for separation from construction and public.
10/29/2018 ENGR Grading Final RLEDONNE Continued Entered by CBELL1 - Met on site with GC went over roof drains and Ada parking area. ok for OK FOR TCO FOR EAST SIDES OF BUILDINGS #927 & #928 ONLY.
10/25/2018 ENGR Grading Final RLEDONNE Partial Approval Entered by CBELL1 - Roof drains on east side of building number 927 are going over sidewalk and in to Ada parking area Ada parking spaces for buildings 927 + 928 and access to building from Ada parking okay. Provide temporary separation from construction and public for T C of o for engineering
10/19/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THIS INSPECTION HAS BEEN RESCHEDULED BY GERALD TO TAKE PLACE ON 10/19
10/22/2018 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - LOOKED OVER THE SITE AND WILL BE COMING OUT THIS WEEK TO LOOK AT THE LANDSCAPE PLANS TO SEE HOW MUCH OF THE WORK HAS BEEN COMPLETED AT THIS TIME. THE DEVELOPER/CONTRACTOR WILL BE LOOKING FOR A TEMPORARY CERTIFICATE OF OCCUPANCY BY THE END OF THIS WEEK OR THE FOLLING WEEK.
07/23/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - DROVE THROUGH THE AREAS AND CHECKED ALL OF THE SIDEWALK THAT IS SCHEDULED TO BE POURED AT THIS TIME.
07/05/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREWS ARE WORKING HARD AT WORKING ON COMPLETING ALL ITEMS ADJACENT TO THE BUILDINGS THAT THEY WILL BE ASKING FOR TCO'S ON IN EITHER OCTOBER OR NOVEMBER.
06/21/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED OVER THE FORMED SIDEWALK THAT THE HAVE ALONG THE NORTH SIDE OF THE WESTERN MOST BUILDING NEAR THE AREA OF A DROP-OFF ZONE. I WILL BE CHECKING WITH THE ZONING AND ENGINEERING REVIEWERS TO SEE IF SOME OF THE TRUNCATED DOME AREAS CAN BE ELIMINATED, IF SO IT WILL REQUIRE A REVISION TO THE PLANS FOR THIS SITE.
05/04/2018 ENGR Grading Final MRUSSO Cancelled Entered by DROBERT5 - CANCELLED INSPECTION, NO ACCESS. CALL FOR RE-INSPECTION ON MONDAY 5-7-18
04/24/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - WALKED VISTOR CENTER SITE WITH GC.
04/05/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - RCP AND CATCH BASIN ON SOUTH EAST SIDE OF SITE OK.
03/29/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - 36'' RCP PER HIGH LIGHTS ON PAGE C1.UW3.
03/20/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - 18'' STORMWATER PIPING PER HIGH LIGHTS ON PAGE C1.U04.
03/14/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - HIGH LIGHTS FOR SD PIPING ON PAGE C1.U10/ U11/08.
03/12/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - PAGE C2.S14 36'' RCP STROM WATER PIPING .
03/06/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE CREWS HAVE INSTALLED 12 STICKS OF 36" RCP, THE PIPE IS APPROVED AND READY FOR BACKFILL.
03/07/2018 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - LOOKED AT THE DRAINAGE PIPE INSTALLATION SINCE YESTERDAY, THE CREW HAS LAID 9 JOINTS OF ADDIONAL 36" RCP, THIS IS ALL APPROVED FOR BACKFILL.
03/05/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - NO CHANGE FROM LAST INSPECTION.
03/02/2018 ENGR Grading Final RLEDONNE Continued Entered by RLEDONN1 - SD PIPING ON SOUTH SIDE OF BUILDING PER HIGH LIGHTS . PROVIDE WITH CHANGES.
07/18/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - DROVE THROUGH THE SITE WITH THE CONTRACTOR AND VIEWED THE CURRENT CONDITIONS. GRADING OF THE SITE IS THE CURRENT SCHEDULE THAT THEY ARE MAINLY WORKING ON, AND STARTING THE FOOTER EXCAVATIONS FOR SOME OF THE BUILDINGS.