Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP17-0052
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/16/2018 | SITE - Stormwater Follow-up | DROBERTS | Approved | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
08/02/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME. |
08/02/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME |
07/23/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME FROM THE RECENT RAINS, |
07/18/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME |
07/05/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - DROVE THROUGH THE SITE AND THE CONTROLS ARE STILL IN PLACE AND APPEAR TO BE CAUSING NO ISSUES. THEY WILL BE SUBMITTING CURB CUT CHANGES FOR THE BASIN AREAS ADJACENT TO THE ROADWAYS, REDUCING THE NUMBER THAT THEY HAVE TO HAVE CUT. |
06/21/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - SOME MINOR DIRT ON THE INTERNAL STREETS, HAVE ADVISED THE CONTRACTOR TO RUN THE BROOM FOR CLEANUP OF THE SITE. |
06/19/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - REMINDED THE CONTRACTOR TO KEEP ALL OF THE MUD ON THE SITE AND NOT OUT INTO AERO PARK ROAD, NO OTHER CONCERNS AT THIS TIME. |
06/08/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - DROVE THROUGH THE SITE THERE ARE NO CONCERNS AT THIS TIME FOR THE STORMWATER ITEMS. MET WITH THE CONTRACTOR AND ADVISED THEM THAT THEY STILL NEED TO BE CALLING IN FOR THE STORMWATER FOLLOW-UP INSPECTION EVERY 2 WEEKS. |
04/24/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - |
03/06/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - SITE IS OK AT THIS TIME, SWEEPERS ARE WORKING SWEEPING HERMANS ROAD |
03/07/2018 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME FOR THE STORMWATER ITEMS |
03/01/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT ON STREETS. |
01/25/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME. |
01/05/2018 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO TRACK OUT ON ROADS AT THIS TIME. |
12/11/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SITE WENT OVER REPAIRS TO SWPPP. |
11/15/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
10/24/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ABOUT CLEANING UP TRACK OUT AND ADDING ROCK TO EXIT. |
09/19/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT VISTER CENTER AND STREETS. |
08/24/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
08/01/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE MET WITH GC ABOUT CONCRETE CLEAN UP. SWEEPRE WORKING ON STREETS. |
07/26/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET ON SITE WITH GC . NO CONCERNS AT THIS TIME. |
07/18/2017 | SITE - Stormwater Follow-up | DROBERTS | Continued | Entered by DROBERT5 - NO CONCERNS AT THIS TIME, RECENT RAINS ARE BEING KEPT WITHIN THE SITE AS DESIGNED. |
06/29/2017 | SITE - Stormwater Follow-up | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC ON SITE SAND BAGES HAVE BEEN ADDED TO WATTLES. WENT OVER WITH GC TO ADD MORE WATTLE AND WHERE TO MOVE SAND BAGES. |