Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP17-0052
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/01/2019 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/19/2018 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - THIS INSPECTION HAS BEEN RESCHEDULED BY GERALD TO TAKE PLACE ON 10/19 |
10/22/2018 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - MET WITH GERALD AND WALKED THE SITE TO SEE WHAT IS NEEDED PRIOR TO THE APPROVAL FOR THE TEMPORARY CERTIFICATE OF OCCUPANCY. I WILL START LOOKING AT THE SITE NEXT WEEK WHEN i RETURN FOR THE FULL RELEASE OF THE SITE. A PUNCHLIST WILL BE CREATED FOR ALL OF THE REMAINING ITEMS THAT WILL NEED TO BE COMPLETED PRIOR TO THE FINAL INSPECTION. CURREENTLY THERE IS A QUESTION ABOUT WHETHER A WHEELCHAIR ACCESS RAMP WILL BE REQUIRED FOR THE NORTH SIDE OF THIS BUILDING EAST OF THE CENTERLINE OF THE SITE. I WILL DISCUSS THIS ISSUE WITH STEVE SHIELDS BEFORE I TURN THE INFORMATION BACK OVER THE THE CONTRACTOR. |
10/16/2018 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
08/01/2018 | ENGR Engineering Final | DROBERTS | Continued | Entered by DROBERT5 - THE CONTRACTOR HAS CALLED IN FOR THE MULTI PURPOSE BUILDING STAIRWAY FOR INSPECTION, I HAVE ADVISED THEM THAT THIS INSPECTION IS TO BE DONE BY RAY CAMACHO UNDER THE BUILDING PERMIT. THERE ARE NO OTHER ISSUES THAT I NEED TO ADDRESS TODAY. |
05/02/2018 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by RLEDONN1 - PROVIDE CERT LETTER FROM ENGINEER OF RECORD FOR ALL GRADING AND DARINAGE FOR FINAL ON VISTOR CENTER ( ONLY ). |
04/03/2018 | ENGR Engineering Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR MAT FOR TRASH ENCLOUSRE COMPLETE AT VISTOR CENTER. |
06/18/2019 | ENGR Engineering Final | BBENEDON | Approved | Entered by DMERANZ1 - |
02/04/2019 | ENGR Engineering Final | DROBERTS | Partial Approval | Entered by DROBERT5 - COMPLETE ALL WORK ON THE SITE PER THE APPROVED PLANS AND PROVIDE A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD. |
01/31/2019 | ENGR Engineering Final | DROBERTS | Continued | Entered by CBELL1 - rescheduled for 02/01/2019 |
01/14/2019 | ENGR Engineering Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - THIS SITE IS NOT COMPLETE AT THIS TIME FOR THE INSPECTION THAT HAS BEEN CALLED IN. |
05/04/2018 | ENGR Engineering Final | MRUSSO | Denied | Entered by DROBERT5 - COMPLETE OVERALL SITE CONSTRUCTION PER THE APPROVED PLANS, CALL FOR RE-INSPECTION |