Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/20/2017 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SITE IS LESS THAN 1 ACRE THEREFORE NO SWPPP IS REQUIRED, HOWEVER THE CONTRACTOR MUST KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION.
2) LOOKED AT RE-BAR AND FOOTINGS FOR TRASH ENCLOSURES - OK FOR CONCRETE
3) CALL FOR RE-INSPECTION FOR TRASH ENCLOSURE PAD AND APRON.
4) CALL FOR INSPECTION FOR ANY SITE/GRADING/LANDSCAPE CONCERNS |