Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 11/09/2016 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
3) POST A COPY OF YOUR NOI
4) INSTALL A CONCRETE WASH OUT ON SITE
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP
6) SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAYS ROUTINELY
7) CALL FOR INSPECTION FOR ANY SITE QUESTIONS/CONCERNS
8) NPPO APPROVED |