Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP16-0094
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/03/2017 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
10/31/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - COMPLET KEY NOTE #11 ON PAGE 4 OF 11. STABILIZE LOT NORTH OF SITE. COMPLET INSTALL OF LONG TERM BIKE PARKING. PROVIDE CERT LETTER. ENGINEERING ( ONLY) OK FOR TEMP C OF O. |
10/27/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - |
11/03/2017 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
10/31/2017 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RLEDONN1 - NOTE UNDER ENGINEERING. |