Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 04/01/2016 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - APPROXIMATELY 50 FEET OF WALL BEING INSTALLED AT THIS TIME. FOOTER INSPECTION PERFORMED, IT IS OK FOR THE POUR 2 #4 BARS IN THE FOOTER WITH #4 VERTICAL BARS @ 30" ON CENTER. |
| 11/02/2023 |
ENGR Engineering Final
|
|
Passed |
several plants need replacing. 2 of3 ADA parking spaces are non-compliant (west side). signs height too low, no ramps in parking space. no van accessible areas. |