Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP16-0002

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
08/14/2017 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/17/2017 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/02/2017 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/09/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - THE SITE WILL BE CHECKED TODAY TO VERIFY WHAT TYPE OF WORK HAS BEEN DONE SINCE NONE OF THE INSPECTIONS HAVE BEEN SCHEDULED.
10/02/2017 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 - THE CORRECTIONS HAVE BEEN MADE WITHIN PHASE I OF PART G, ANY REMAINING WORK WILL BE TRANSFERED TO PHASE II.
08/10/2017 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - MET WITH JEFF TO DISCUSS THE SITE WORK THAT HAS BEEN DONE WITHOUT ANY INSPECTIONS. HE WILL SCHEDULE FOR THIS SITE TO BE INSPECTED NEXT WEEK WITH THE INTENT OF BEING ABLE TO CLOSE THE SITE AS SOON AS POSSIBLE. I HAVE ASKED THAT HE CONTACT PATRICIA GEHLEN AND LOOK AT WHAT THIS SITE WILL NEED TO HAVE COMPLETED SO THAT THE ASSURANCES AND THE DEVELOPMENT PACKAGE WILL NEED FOR A CLOSURE. I HAVE ADVISED JEFF THAT DUE TO THE FACT OF HOW MANY OF THE LOTS STILL HAVE NOT BEEN CONSTRUCTED ON AT THIS TIME A DEVELOPMENT PACKAGE WILL HAVE TO REMAIN OPEN SO THAT THEY CAN MAINTAIN THE REQUIRED NOTICE OF INTENT ISSUED BY THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY. HE WILL DISCUSS THIS ISSUE WITH PATRICIA TO ENSURE THAT MEET THE REQUIREMENTS FOR THIS SITE. I WILL PERFORM THE INSPECTION ONCE IT HAS BEEN SCHEDULED AND WILL PROVIDE THEM WITH A LIST OF INCOMPLETE ITEMS FOR THE DEVELOPMENT PACKAGE AND FOR THE ASSURANCES.
01/05/2024 ENGR Grading Final Passed