Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP16-0002
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/02/2017 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by DROBERT5 - |
08/14/2017 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Correction Required | Entered by DROBERT5 - STARTED LOOKING AT THE COMMON AREAS AND CHECK ON THE ISSUES THAT WILL NEED TO BE CORRECTED BEFORE THE SITE CAN BE FULLY RELEASED. BELOW ARE A LIST OF THE ITEMS THAT HAVE BEEN NOTED ON THIS DATE. THIS IS NOT COSIDERED TO BE A FULL LIST OF ALL THE INCOMPLETE ITEMS AT THIS TIME, I HAVE 2 MORE DAYS OF INSPECTIONS SCHEDULE FOR THIS WEEK. 1) COMPLETE ALL OF THE COMMON AREAS AS SHOWN ON THE APPROVED PLANS, ENSURE THAT ALL THE PLANTS ARE VIABLE WHEN THE FINAL INSPECTION IS COMPLETED. SOME OF THE AREAS SHOW SIGNS OF PLANTS THAT MAY BE STRESSED OR MAY BE DIEING. I WILL MAKE SURE TO LIST ALL COMMON AREAS THAT NEED ATTENTION AND THE CONDITION THAT NEEDS TO BE LOOKED AT FOR THE FINAL LIST. 2) CHECK ALL REAR LOT DRAINAGE AND ENSURE THAT IT HAS BEEN CONSTRUCTED PER THE DETAILS OF THE APPROVED PLANS. THESE AREAS WILL REQUIRE HAND PLANCED ROCK RIP RAP ON FILTER FABRIC AS SHOWN IN DETAIL 9 ON SHEET 3 OF THE APPROVED PLANS DP15-0191. |
10/02/2017 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by DROBERT5 - THE CORRECTIONS HAVE BEEN MADE WITHIN PHASE I COMMON AREAS AT THIS TIME. |
08/14/2017 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Correction Required | Entered by DROBERT5 - STARTED LOOKING AT THE COMMON AREAS AND CHECK ON THE ISSUES THAT WILL NEED TO BE CORRECTED BEFORE THE SITE CAN BE FULLY RELEASED. BELOW ARE A LIST OF THE ITEMS THAT HAVE BEEN NOTED ON THIS DATE. THIS IS NOT COSIDERED TO BE A FULL LIST OF ALL THE INCOMPLETE ITEMS AT THIS TIME, I HAVE 2 MORE DAYS OF INSPECTIONS SCHEDULE FOR THIS WEEK. 1) COMPLETE ALL OF THE COMMON AREAS AS SHOWN ON THE APPROVED PLANS, ENSURE THAT ALL THE PLANTS ARE VIABLE WHEN THE FINAL INSPECTION IS COMPLETED. SOME OF THE AREAS SHOW SIGNS OF PLANTS THAT MAY BE STRESSED OR MAY BE DIEING. I WILL MAKE SURE TO LIST ALL COMMON AREAS THAT NEED ATTENTION AND THE CONDITION THAT NEEDS TO BE LOOKED AT FOR THE FINAL LIST. 2) CHECK ALL REAR LOT DRAINAGE AND ENSURE THAT IT HAS BEEN CONSTRUCTED PER THE DETAILS OF THE APPROVED PLANS. THESE AREAS WILL REQUIRE HAND PLANCED ROCK RIP RAP ON FILTER FABRIC AS SHOWN IN DETAIL 9 ON SHEET 3 OF THE APPROVED PLANS DP15-0191. |