Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/02/2016 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 12/02/2016 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 01/15/2016 |
ENGR Grading Final |
DROBERTS |
Not ready for Inspection |
Entered by DROBERT5 - COMPLETE AS SHOWN ON THE APPROVED PLANS |
| 12/02/2016 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 08/02/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - THE SITE STILL IS NOT AS SHOWN ON THE APPROVED PLANS AND WILL NEED TO BE ADDRESSED BY THE EOR JEFF STANLEY AND APPROVED BY THE REVIEW STAFF FOR ZONING AND ENGINEERING. MOST OF THE AREA THAT IS AFFECTED IS LANDSCAPING ADJACENT TO SPEEDWAY BL SOUTH OF THIS SITE, AND A FEW MISSING TREES IN THE NORTH EAST QUADRANT OF THE SITE.
ALSO DISCUSSED AGAIN AT THIS TIME IS THE REMOVAL OF 9 STORAGE BINS LOCATED THROUGHOUT THIS SITE THAT AFFECT THE FIRE ACCESS THROUGH THE PAALLS. EIGHT OF THE BINS ARE IN THE ROADWAY ALONG THE EAST SIDE OF THE SITE NORTH OF SPEEDWAY. IHAVE ASKED THAT THE OWNER OF THE SITE OBTAIN TEMPORARY USE PERMITS FOR THE BINS OR REMOVE THEM FROM THE SITE. |
| 02/23/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - I MET WITH THE CONTRACOR, DEVELOPER, TO DISCUSS THE ISSUES AT HAND. THEY WILL TAKE THE REVISIONS THAT WILL COVER ALL THE AREAS THAT HAVE BEEN CHANGED FROM THE ORIGINAL DRAWINGS AND TRY TO ENSURE THAT THEY ASR AS SHOWN ON THE REVISIONS PRIOR TO SCHEDULING ANOTHER INSPECTION FOR THIS SITE. HE WILL ALSO LOOK AT THE ISSUES THAT I HAVE RAISED IN REGARDS TO THE DRAINAGE PATTERNS CHANGING ON THIS SITE. THE EOR WILL MAKE CHANGES TO THE PLANS THAT REFLECT THE ADDITION OF FILTER FABRIC AND ROCK RIP RAP IN BOTH EAST AND WEST PARKING AREAS. HE WILL AS-BUILT ALL OF THE CHANGES AFTER THEY HAVE BEEN MADE AND APPROVED BY THE REVIEW STAFF. HE WILL PROVIDE APPROVED AS-BUILT DRAWINGS AND A CERTIFICATION LETTER FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THE SITE. THE FINAL INSPECTION WILL NOT BE PERFORMED TILL ALL OF THE CHANGES HAVE BEEN REVIEWED AND ACCEPTED BY THE REVIEWERS FOR ENGINEERING AND ZONING. |
| 02/18/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - I MET WITH THE CONTRACOR, DEVELOPER, AND EOR AND DISCUSSED THE ISSUES AT HAND. JEFF STANLEY WILL DRAW UP SOME RIVISIONS THAT WILL COVER ALL THE AREAS THAT HAVE BEEN CHANGED FROM THE ORIGINAL DRAWINGS. HE WILL ALSO LOOK AT THE ISSUES THAT I HAVE RAISED INREGARDS TO THE DRAINAGE PATTERNS CHANGING ON THIS SITE. HE WILL MAKE CHANGES TO THE PLANS THAT REFLECT THE ADDITION OF FILTER FABRIC AND ROCK RIP RAP IN BOTH EAST AND WEST PARKING AREAS. HE WILL AS-BUILT ALL OF THE CHANGES AFTER THEY HAVE BEEN MADE AND APPROVED BY THE REVIEW STAFF. HE WILL PROVIDE APPROVED AS-BUILT DRAWINGS AND A CERTIFICATION LETTER FOR ALL THE CHANGES THAT HAVE BEEN MADE TO THE SITE. THE FINAL INSPECTION WILL NOT BE PERFORMED TILL ALL OF THE CHANGES HAVE BEEN REVIEWED AND ACCEPTED BY THE REVIERS FOR ENGINEERING AND ZONING. |
| 02/17/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - MET WITH THE CONTRACTOR ON SITE AND DISCUSSED THE WORK THAT IS HAPPENING. I ADVISED THEM THAT I HAVE SOME DRAINAGE CONCERNS IN BOTH AREAS OF THE SITE AND ARE AS FOLLOWS:
1) WEST SIDE APPEARS TO FLOW IN A NORTHERLY DIRECTION TILL IT HITS THE NORTHEN MOST END THEN PORTION OF THE FLOW TURNS EAST AND CONTINUES DOWN THE EXISTING ROADWAYS. SOME OF THE WATER APPEARS THAT IT WILL NOT TURN AND WILL CONTINUE NORTH TILL IT RUNS OVER THE TOP OF THE SIDEWALK AT THE NORTH END OF THIS AREA.
2) EAST SIDE FLOWS FOR THE PARKING AREAS WILL CONTINUE TO FLOW IN A NORTHERLY FASHION TO THE DRAINAGE OUTLET AND INTO THE DESERT TOWARDS THE ADJACENT WASH. THE AREA THAT IT FLOWS OVER IS 50 - 75 FEET OF LEVEL FILL MATERIAL THAT HAS BEEN PLACES IN THE AREA BY THE CONTRACTOR. THIS MATERIAL IS A MIX OF FRACTURED AND NON-FRACTURED ROCK FROM 1 INCH TO 18 INCHES AND IS MIXED WITH ALOT OF DIRT. RUNNING WATER OVER THIS MATERIAL AT THIS TIME WILL ALLOW THE SEDIMINT AND THE FINES TO BE WASH DOWNSTREAM TOWARDS THE WASH AND MOST LIKELY INTO THE WASH OVER TIME.
3) THE LAST AREA OF CONCERN AT THIS TIME IS LOCATED IN THE EAST PARKING AREA ALONG THE WEST SIDE OF THE SIDEWALK. THIS AREA WILL CATCH ALL OF THE NUISANCE AND DIRTECT IT IN A NORTHERLY DIRECTION. THE ISSUE WITH THIS WATER IS THAT THE EOR DID NOT REQUIRE SCUPPERS IN THE SIDEWALKS THAT JOIN THE APARTMENTS TO THE PARKING LOT AREAS. THESE SIDEWALKS RUN PERPENDICULAR TO THE NEW SIDEWALKS AND WILL ACT AS A TRAP FORCING ALL OF THE DRAINAGE WATER OVER AND ONTO THE SIDEWALKS AND MAYBE INTO THE SOME OF THE APARTMENTS LOCATED WEST OF THE PARKING AREA.
I HAVE ASKED TO HAVE A MEETING WITH THE DEVELOPER, CONTRACOR, AND THE EOR TOMORROW TO DISCUSS WHAT MIGHT BE A VIABLE SOLUTION FOR THE ISSUES THAT HAVE ARISED. |
| 02/16/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - CREWS ARE WORKING ON COMPLETEING THE SUBGRADE FOR THE PAVING ARTEAS LOCATED ON THE WEST AND EAST SIDES OF THE SITE. I WILL MEET WITH THE CONTRACTOR AND GENERAL CONTRACTOR TOMORROW AND DISCUSS ISSUES THAT I HAVE AT THIS TIME. |
| 01/15/2016 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - CREWS WORKING ON THE CURB FORMS IN THE WEST SIDE PARKING AREA. CREWS WILL START WORKING ON THE FIRST COURSE OF THE TRASH ENCLOSURE TODAY AND TOMORROW |
| 12/23/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SPOKE WITH SUPERINTENDENT, ZONING REVIEWER, AND ENGINEERING REVIEWER WITH THE CITY OF TUCSON ABOUT ADA ACCESS AND PARKING.
2) PER THE APPROVED PLANS AND THE CITY OF TUCSON ADA ACCESS AND PARKING IS ONLY REQUIRED WHEN OR IF THE CONTRACTOR ALTERS OR REPLACES EXISTING ADA RAMPS OR PARKING ON SITE.
3) ANY NEWLY CONSTRUCTED HC RAMPS OR PARKING MUST ALSO MEET ADA REQUIREMENTS |
| 12/17/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS |
| 11/30/2015 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ANY CHANGES TO THE APPROVED PLANS MUST BE REVISED AND APPROVED
2) ENSURE SEDIMENT CONTROLS ARE INSTALLED ALONG THE NORTH END OF THE PROJECT TO PROTECT THE EXISTING WASH FROM CONSTRUCTION DEBRIS/MATERIAL.
3) RECOMMEND A PHYSICAL BARRIER OR SEPARATION FROM CONSTRUCTION AND THE PUBLIC. A LIFE/SAFETY HAZARD EXISTS AT THIS TIME.
4) A FINAL INSPECTION WILL BE ACCOMPLISHED USING THE APPROVED PLANS
5) PROVIDE A CERT STATEMENT FROM THE EOR PRIORTO FINAL APPROVAL. |
| 11/18/2015 |
ENGR Grading Final |
DROBERTS |
Continued |
Entered by DROBERT5 - 1) PROVIDE APPROVED REVISED PLANS FOR THIS SITE ASAP.
2) PROVIDE STORMWATER CONTROLS AT THE NORTH END OF ALL DISTURBED AREAS TO PREVENT SOIL DISPLACEMENT DURING FUTURE WEATHER STORMS.
3) CALL IN GRADING INTERMEDIATE AND STORMWATER INSPECTIONS WEEKLY.
|