Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/27/2016 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/06/2016 |
ENGR Engineering Final
|
DROBERTS |
Partial Approval |
Entered by DROBERT5 - PROVIDE THE APPROVED REVISED PLANS FOR THE CURRENT CONDITIONS OF THE SCZ AREA ALONG SPEEDWAY |
| 12/02/2016 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 07/26/2016 |
ENGR Engineering Final
|
DROBERTS |
Correction Required |
Entered by DROBERT5 - THE WORK HAS BEEN COMPLETED AND MINOR MODIFICATIONS HAVE BEEN MADE THROUGHOUT THE SITE THAT REQUIRE REVISED DRAWINGS. |
| 03/10/2016 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by MRUSSO1 - PRIORE TO FINAL GRADING APPROVAL:
1) COMPLETE ALL SITE/GRADING/LANDSCAPING PER THE APPROVED PLANS
2) ENSURE YOU COMPLY WITH ALL AGREEMENTS AND CONDITIONS MADE WITH THE CITY OF TUCSON.
3) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD |
| 11/30/2015 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) ANY CHANGES TO THE APPROVED PLANS MUST BE REVISED AND APPROVED
2) ENSURE SEDIMENT CONTROLS ARE INSTALLED ALONG THE NORTH END OF THE PROJECT TO PROTECT THE EXISTING WASH FROM CONSTRUCTION DEBRIS/MATERIAL.
3) RECOMMEND A PHYSICAL BARRIER OR SEPARATION FROM CONSTRUCTION AND THE PUBLIC. A LIFE/SAFETY HAZARD EXISTS AT THIS TIME.
4) A FINAL INSPECTION WILL BE ACCOMPLISHED USING THE APPROVED PLANS
5) PROVIDE A CERT STATEMENT FROM THE EOR PRIORTO FINAL APPROVAL. |