Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP15-0052
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/07/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
03/07/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
02/17/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CONTRACTOR IS COMTINUEING FULLY AT THIS TIME. |
10/22/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO GRADING ACTIVITY. |
10/06/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
09/08/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO CONCERNS AT THIS TIME. |
07/20/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH JIM BURGE WENT OVER SITE SEWER. |
03/07/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
03/09/2016 | ENGR Grading Final | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - THIS INSPECTION IS NOT READY AT THIS TIME. THE CREWS ARE WORKING ON THE DRIVEWAY ENTRANCE INTO THE SITE OFF OF PALO VERDE. JOSE/602-677-7521 WITH HARD ROCK CONCRETE WAS ADVISED THAT THIS AREA IS ONE THAT NEEDS TO BE CHECKED BY THE TRANSPORTATION DEPARTMENT SINCE IT IS WITHIN THE RIGHT-OF-WAY. A CREW IS WORKING ON PREPARING AN AREA ON THE NORTHSIDE OF THE BUILDING THAT WILL BE POURED LATER ON TODAY. ALSO A CREW HAS POURED THE OUTER EASTERN PORTION OF THE SIDEWALK EAST OF THE ALVERNON DOOR ENTRANCE ON THE EAST SIDE OF THE BUILDING. |
10/12/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH GC INSTALLING CURBING . |
07/20/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON TRASH ENCLOSURES BLOCK WORK. |
03/07/2018 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
04/20/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS WORKING IN THE FOLLOWING AREAS: 1) HYDROSEED PL;ACEMENT NORTHSIDE OF CORONA FROM THE CORONA ENTRANCE WEST TO PALO VERDE RD. 2) GRADING FOR THE SIDEWALK AROUND THE NEW BUS STOP ON CORONA. 3) NO STORMWATER CONCERNS AT THIS TIME. 4) INSTALLATION OF THE FOAM BOARD IN THE AREA AROUND THE MAINENTRANCE LOCATED AT THE SOUTH EAST CORNER OF THE MAIN STRUCTURE. |
03/08/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERTS - LOOKED OVER THE SITE TO SEE WHAT TYPE OF WORK IS GOIN ON AT THIS TIME. CREWS ARE WORKING ON SPREADING DG ROCK ADJACENT TO THE ALVERNON RIGHTS-OF-WAY EAST OF THE EAST PARKING LOT. A CONCRETE CREW IS WORKING AT POURING SIDEWALKS EAST OF THE SE EAST INTO THE DISTRIBUTION CENTER, THE REMAINING PORTION OF SIDEWALK WILL BE POURED ON 3/9/16. THE HANDICAP PARKING SPACES IN THIS AREA HAVE BEEN PAINTED RECENTLY AND CURRENTLY ARE BLOCKED FROM ANY USE. CREWS WORKING ON THE STRIPING OF THE WEST PARKING LOT. LIGHT POLES HAVE BEEN LAID OUT AT EACH OF THE POLE LOCATIONS AND WILL BE ERECTED IN THE NEXT 2 WEEKS BY MOUNTAIN POWER. |
03/17/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREW ARE FORMING SIDEWALKS WEST OF ALVERNON ALONG THE NORTHSIDE OF CORONA. AND ARE ALSO POURING SECTIONS IN THE SMAE AREA. FORMING WILL CONTINUE WEST OF THESE LOCATIONS TO BE POURED TOMORROW. |
03/18/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS WORKING ON POURING SIDEWALKS ALONG THE NORTHSIDE OF CORONA RD EAST AND WEST OF THE ENTRANCE OFF OF CORONA RD. |
02/17/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS ARE WORKING ON FORMING THE CURB RETURNS ON THE ALVERNON AND CORONA ROAD ENTRANCES INTO THE SITE. THIS WORK IS BEING CHECKED BY THE PIMA COUNTY INSPECTOR, HIS NAME IS BILL LANDERS AND HIS PHONE NUMBER IS (520) 349-2667. MOUNTAIN AND POWER IS WORKING ON INSTALLATION OF ELECTRICAL LINES ALONG THE NORTH SIDE OF CORONA AND WILL CONTINUE THIS THROUGH THE REMAINDER OF THE WEEK. |
10/30/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON CURBS ON SOUTH WEST SIDE OF SITE. |
10/26/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON TRACK OUT ROCK. |
10/16/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON SOUTH SIDE HEAD WALL. NEED TO SEE DETAIL FOR REBAR. |
10/14/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by DROBERT5 - INSPECTION PER HIGH LIGHTS ON PAGE GD. 4 & GD.5. ON SMALL SET OF AP PALNS. |
07/07/2015 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GC WENT OVER AP PLANS. |
05/08/2015 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS ARE WORKING ONSITE PERFORMING THE FOLLOWING TASK: 1) FILLING THE WATER POND FULL OF WATER, LINER HAS ALREADY BEEN INSTALLED, THIS SHOULD BE COMPLETED BY THE END OF THIS WEEKEND. 2) INSTALLING THE CONTROLS AS NEEDED IN THE LOW AREAS THROUGHOUT THE SITE. 3) GRINDING UP THE EXCESSIVE VEGETATION THAT HAS BEEN REMOVED FROM THE SITE. 4) PREPPING THE PLANTS THAT WILL BE PLACED IN THE NURSARY AND BOXING TREES. 5) SURVEY CREW IS ONSITE PERFORMING THE SITE LAYOUT FOR FUTURE CONSTRUCTION. |