Permit: DP15-0052

Parcel: 14041134D

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP15-0052

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
03/07/2018 SITE - Stormwater Follow-up DROBERTS Approved Entered by DROBERT5 -
04/20/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME.
03/08/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERTS - MINOR AMOUNTS OF STANDING WATER IS BEING HELD WITHIN ALL THE BASINS FROM THE PREVIOUS RAINS YESTERDAY
03/18/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME.
03/17/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME.
02/17/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CREWS ARE FORMING THE CURB RETURNS ON CORONA AND ALVERNON AT THE ENTRANCES INTO THE SITE. THESE AREAS ARE TO BE INSPECTED BY THE PIMA COUNTY INSPECTORS SINCE IT IS THEIR RIGHTS-OF-WAY. THE CREW FROM MOUNTAIN AND POWER ARE WORKING ON THE INSTALLATION OF CONDUITS ALONG THE NORTH SIDE OF CORONA RD BETWEEN PALO VERDE AND ALVERNION.
03/09/2016 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CREWS WORKING ON CONCRETE ITEMS AT VARIOUS LOCATIONS THROUGHOUT THE SITE.
01/04/2016 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
12/16/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
10/23/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH GC ABOUT TRACK OUT AND TO ADD TRACK OUT ROCK.
10/15/2015 SITE - Stormwater Follow-up RLEDONN1 Continued Entered by RLEDONN1 - INSPECTION FOR BOX CULERT ON SOUTH SIDE OF SITE.
10/14/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DROBERT5 - NO CONERNS AT THIS TIME.
08/25/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
07/22/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
07/15/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
06/10/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.
06/02/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - NO CONCERNS AT THIS TIME.
05/08/2015 SITE - Stormwater Follow-up DROBERTS Continued Entered by DROBERT5 - NO CONCERNS AT THIS TIME. CREW IS WORKING ON INSTALLING STORMWATER CONTROLS, AND PREPPING PLANTS THAT ARE TO BE PLACED IN THE NURSARY.
05/19/2015 SITE - Stormwater Follow-up RLEDONNE Continued Entered by RLEDONN1 - MET WITH MIKE ABOUT SWPPP CONTROLS AND REPORT.