Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP15-0052

Parcel: 14041134D

Inspection Status: Passed

Inspection History: PDSD Site/Engineering Division - Landscaping

Permit Number - DP15-0052

Inspection Description - PDSD Site/Engineering Division - Landscaping

Inspection Status - Passed

Date Description Inspector Results Comments
04/11/2018 PDSD Site/Engineering Division - Landscaping DROBERTS Approved Entered by DROBERT5 -
03/09/2018 PDSD Site/Engineering Division - Landscaping DROBERTS Partial Approval Entered by DROBERT5 - THE SITE HAS BEEN INSPECTED AND THE FOLLOWING HAS BEEN NOTED THAT NEEDED TO BE COMPLETED OR REPAIRED: 1) EROSION HAS BEEN NOTED IN THE BASIN LOCATED AT THE SOUTHWEST CORNER OF THE SITE. THIS EROSION IS AT THE INLET STRUCTURE, IT IS CAUSED FROM WATER RUNNING OVER AREAS NOT PROTECTED BY ROCK RIP RAP ON FILTER FABRIC MIRAFI 180N. ARMOR THIS AREA WITH ADDITIONAL FILTER FABRIC/MIRAFI 180N AND ADDITIONAL ROCK RIP RAP. 2) THE DRAINAGE WAY COMING INTO THE ABOVE MENTIONED BASIN FROM THE SOUTH IS ALSO SHOWING SIGNS OF EROSION AND NEEDS TO BE REPAIRED AS MENTIONED ABOVE. ALSO IN THIS AREA THERE IS NO FILTER FABIC SHOWING UNDER THE EXISTING ROCK THAT WAS ORIGINALLY PLACED. THEIS AREA WILL NEED TO HAVE SOME OF THE ROCK REMOVED TO EXPOSE THE FILTER FABRIC FOR VERIFICATION OF ITS PLACEMENT. 3) MINOR EROSIN HAS BEEN NOTED IN ALL THE BASINS FOR THIS SITE, THESE WILL NEED TO BE REPAIRED IN THE SAME MANOR IF THE EROSION IS DEEP. SOME AREAS MAY REQUIRE ONLY SMALL AMOUNTS OF REPAIR WITH COMPACTED SOILS AND DECOMPOSED GRANITE. 4) THE SOUTHERN DRAINAGE SWALE HAS MINOR AREAS OF EROSION NOTED THROUGHOUT ITS LENGTH THAT NEED TO BE REPAIRED. ALSO IN THIS CHANNEL WEST OF THE SOUTHERN ENTRANCE OFF OF CORONA AND IRRIGATION LINE IS EXPOSED THAT SPANS THE DRAINAGE CHANNEL. MAKE ANY NECESSARY REPAIRS TO THE PVC PIPE THAT MAYBE REQUIRED AND BURY THIS PIPE SO THAT IT IS NOT EXPOSED. 5) GENERAL CLEAN UP OF THE SITE TO ENSURE THAT ALL OF THE CONSTRUCTION TRASH AND DEBRIS HAVE BEEN REMOVED. WOOD SLATS AND METAL REBAR HAS BEEN NOTED IN DIFFERENT AREAS OF THE SOUTHERN EMPLOYEE PARKING AREAS. REMOVE ALL TRASH AND DEBRIS, STORMWATER WADDLE FROM THE SITE PRIOR TO CALLING FOR A REINSPECTION. 6) PROVIDE A COPY OF THE N.O.T FROM THE STATE FOR THE STORMWATER PERMIT FOR THIS SITE, A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD, AND REVISED APPROVED DRAWINGS FOR THIS SITE NOTING THE AREA OF ARMOR COATING FOR THE OUTFLOW OF THE RETENTION/DETENTION BASIN LOCATED AT THE SOUTHWEST CONER OF THE SITE ADJACENT TO PALO VERDE. CALL ME IF YOU HAVE ANY QUESTIONS ABOUT THIS LIST OR IF YOU WOULD LIKE TO WALK THE SITE WITH ME, DAVID ROBERTS AT (520) 349-7643.
07/26/2016 PDSD Site/Engineering Division - Landscaping DROBERTS Continued Entered by DROBERT5 - ALL PLANTS NEED TO BE RECHECKED.
04/21/2016 PDSD Site/Engineering Division - Landscaping DROBERTS Continued Entered by DROBERT5 - STARTED LOOKING OVER THE SITE, INSPECTION OF THE INDIVIDUAL PLANTS WILL BE STARTED ON 4/22/2016. A CREW IS WORKING ON THE HYDROSEED OUTSIDE OF THE SITE ALONG THE NORTH SIDE OF CORONA FROM THE CORONA GATE EAST TO PALO VERDE.