Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP15-0014
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2017 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/18/2017 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
07/18/2017 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
03/01/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - |
07/18/2017 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
12/22/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO SITE WORK AT THIS TIME. |
11/21/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON LANDSCAPING. AND LOT WALLS. |
09/29/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH DAVE . |
09/08/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
08/05/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - MET WITH GRADING CONTRACTOR ABOUT ADDING SWPPP CONTRLOS AT CURB OPENING. |
05/11/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - NO ACTIVITY ON SITE. |
03/14/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON GROUTING RIP-RAP ON SOUTH SIDE ON SITE. |
03/01/2016 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON WEST SIDE 1 TO 1 SLOPES. SHOTCRETE WITH FIBERS. |