Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 12/16/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/18/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |
| 05/06/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME |
| 04/22/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 03/16/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by ARUIZ1 - 1. INSTALL ADDITIONAL SEDIMENT CONTROLS ALONG THE WEST PERIMETER
2. MAINTAIN SEDIMENT CONTROLS UNTIL THE SITE IS 100% STABILIZED.
3. SWEEP UP ?/ SOIL
4.ENSURE YOU FILE A NOTICE OF TERMINATION WITH ADEQ AT THE END OF THE PROJECT |