Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP14-0140
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/28/2015 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER ENGINEERING INSPECTION RECOMMENDATIONS AND PER SITE SPECIFICS - WILL RE-INSPECT FOR COMPLIANCE 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED PER YOUR SWPPP 3) SWEEP UP TRACKING AS NEEDED 4) ENSURE A PHYSICAL SEPARATION BETWEEN PUBLIC ACCESS AND CONSTRUCTION IS MAINTAINED 5) INSTALL A STABILIZED ENTRANCE 6) INSTALL/USE CONCRETE WASH OUT 7) CALL FOR INSPECTION FOR ANY CHANGES AND/OR CONCERNS. |