Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 02/19/2015 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED.
2) ENSURE EXISTING BUBBLER/CATCH BASIN IS PROTECTED FROM CONSTRUCTION.
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
5) POST A COPY OF YOUR NOI
6) SWEEP UP TRACKING AS-NEEDED
7) CONTRACTOR DIGGING FOOTINGS FOR BLDG |
| 02/10/2015 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED.
2) CONTRACTOR HAS ROUGH GRADED SITE, AND ARE OVER EXCAVATING THE FOUNDATION |