Permit: DP14-0140

Parcel: 125101480


Addresses:

3541 E BROADWAY BL

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
07/01/2015 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
06/10/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR INSTALLING STORM DRAIN ALONG WEST SIDE PER APPROVED PLAN. PICTURES TAKEN 2) ENSURE PRIOR TO FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD IS PROVIDED AND ANY/ALL CHANGES ARE SHOWN ON PLANS 3) NO STORM WATER CONCERNS AT THIS TIME
06/02/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME
05/15/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
05/06/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - ADD SEDIMENT CONTROLS AROUND EXISTING CATCH BASINS ALONG THE NE CORNER OF THE SITE WHERE TRENCHING IS TAKING PLACE. SWEEP UP TRACKED SOIL ALONG TRENCHING
04/03/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR WORKING ON BUILDING, NO SIGNIFICANT UNDERGROUND STORM OR SITE WORK AT THIS TIME 2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION 3) PERFORM STORM WATER SELF INSPECTIONS ROUTINELY
03/12/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by CSHARRA1 - 1. DISCUSSED FOUR MAIN ROOF DRAINS FOR BUILDING. ENSURE SCUPPER/ROOF LEADERS HAVE POSITIVE DRAINAGE 2. WILL REINSPECT WHEN SCUPPERS ARE SET PRIOR TO CONCRETE - TO VERIFY SLOPE 3. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 4. SWEEP UP TRADING ON A ROUTINE BASIS 5. EMPTY CONCRETE WASHOUT WHEN FULL
03/09/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
03/02/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/19/2015 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED. 2) ENSURE EXISTING BUBBLER/CATCH BASIN IS PROTECTED FROM CONSTRUCTION. 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE 5) POST A COPY OF YOUR NOI 6) SWEEP UP TRACKING AS-NEEDED 7) CONTRACTOR DIGGING FOOTINGS FOR BLDG