Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 01/12/2015 |
PDSD Site/Engineering Division - Landscaping |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - 1) PROVIDE VERIFICATION THAT YOU MEET THE REQUIREMENTS OF THE TENTATIVE PLAT.
2)PROVIDE AS-BUILT DRAWINGS AND CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE.
3) VERIFY THE DRAINAGE AT THE NORTHWEST CORNER OF THIS SITE, THIS AREA MAY NEED ADDITIONAL PROTECTION FROM THE CURRENT FLOW PATTERNS. |
| 02/10/2015 |
PDSD Site/Engineering Division - Landscaping |
eleibol1 |
Approved |
Entered by ELEIBOL1 - |