Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/27/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) NO ENGINEERING PRE-CON MEETING CALLED IN, CONTRACTOR ABOUT 25% COMPLETED WITH PROJECT.
2) SOME SITE WORK TO COMPLETE INCLUDE A PARKING LOT, PEDESTRIAN ACCESS, TRASH ENCLOSURE, STORM WATER DRAINAGE AND LANDSCAPING.
3) NO STORM WATER PERMIT REQUIRED, SITE IS LESS THAN 1 ACRE, HOWEVER CONTRACTOR MUST KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION.
4) TRASH ENCLOSURE DIMENSIONS OK. RE-BAR LAYOUT PER STRUCTURAL ENGINEER DETAIL - BOLLARDS SET PER PLAN. OK TO POUR CONCRETE.
5) NO CLEAR NPPO PLAN OR REQUIREMENT.
CALL FOR RE-INSPECTION |