Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/28/2014 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 05/28/2014 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 02/27/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO ENGINEERING PRE-CON MEETING CALLED IN, CONTRACTOR ABOUT 25% COMPLETED WITH PROJECT.
2) SOME SITE WORK TO COMPLETE INCLUDE A PARKING LOT, PEDESTRIAN ACCESS, TRASH ENCLOSURE, STORM WATER DRAINAGE AND LANDSCAPING.
3) NO STORM WATER PERMIT REQUIRED, SITE IS LESS THAN 1 ACRE, HOWEVER CONTRACTOR MUST KEEP DISTURBED SOIL ON SITE DURING CONSTRUCTION.
4) TRASH ENCLOSURE DIMENSIONS OK. RE-BAR LAYOUT PER STRUCTURAL ENGINEER DETAIL - BOLLARDS SET PER PLAN. OK TO POUR CONCRETE.
5) NO CLEAR NPPO PLAN OR REQUIREMENT.
CALL FOR RE-INSPECTION |
| 05/28/2014 |
ENGR Grading Final |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 03/31/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) SUBGRADE SET FOR PARKING, CURB CUTS IN PLACE
3) HC ACCESS RAMP BEING INSTALLED ALONG SE ACCESS AND HC PARKING.
4) CHECKED SLOPES ON ACCESS SIDEWALKS - OK |
| 03/28/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - CONTRACTOR PREPARING FOR PAVING. WILL RE-INSPECT |
| 03/06/2014 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAY
2) PROTECT ANY STORM CATCH BASINS IN AREA AROUND THE CONSTRUCTION SITE.
3) TRASH ENCLOSURE WALL RE-BAR LAYOUT PER APPROVED PLAN, OK TO GROUT
4) ENSURE LANDSCAPE AREAS ARE DEPRESSED 6" MIN |