Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/12/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - SITE IN NON-COMPLIANCE WITH SWPPP
1) POST A COPY OF YOUR SIGNED NOI AT THE ENTRANCE TO THE SITE
2) PERFORM STORM WATER SELF INSPECTION EVERY 14 DAYS AND AFTER A SIGNIFICANT RAINFALL EVENT
3) ADD SEDIMENT CONTROLS (SILT SOCK) ALONG THE SOUTH SIDE OF THE SITE
4) USE EXISTING CURB/WALL ALONG THE WEST AND EAST PERIMETERS AS SEDIMENT CONTROLS.
5) SWEEP UP TRACKED SOPIL OFF ADJACENT PUBLIC ROADWAYS THROUGHOUT CONSTR
6) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT
7) RE-ESTABLISH YOUR ROCK ENTRANCE/EXITS AS NEEDED |