Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 08/19/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Approved |
Entered by DROBERT5 - MAJORITY OF SITE HAS BEEN STABILIZED, SOME LANDSCAPING LEFT |
| 07/24/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 07/19/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN RE-INSTALLED ALONG THE NORTH SIDE OF THE SITE
2) A SIDEWALK HAS BEEN INSTALLED ALONG THE SOUTH PERIMETER.
3) ENSURE THE ROADWAYS AND PARKING AREAS ADJACENT TO THE SITE IS SWEPT ON A ROUTINE BASIS
4) MAKE SURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.
5) ENSURE MAINT IS PERFORMED ON INSTALLED SEDIMENT CONTROLS
|
| 07/17/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Correction Required |
Entered by DROBERT5 - 1) SITE IS IN NON-COMPLIANCE WITH YOUR STORM WATER PERMIT - SEE INSPECTION FROM 7/12
2) FORMS AND GRADE FOR SIDEWALK AND PEDESTRIAN WALKWAY ALONG SOUTH SIDE OF SITE, OK - OK TO POUR CONCRETE.
3) ADD/INSTALL WADDLE ALONG NORTH SIDE. BRING SOIL BACK ON SITE. STABILIZE ALL ENTRANCES/EXITS. MAINTAIN STORM WATER CONTROLS |
| 07/12/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Correction Required |
Entered by DROBERT5 - 1) SITE IS IN NON-COMPLIANCE WITH AZPDES. RE-INSTALL YOUR SEDIMENT CONTROLS PER YOUR SWPPP
2) SWEEP UP TRACKED SOIL OFF ADJACENT PROPERTY
3) HAVE A DESIGNATED OR MULTIPLE DESIGNATED CONSTRUCTION ENTRANCES/EXITS AND STABILIZE THEM
4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM
COMPLY BY 7 DAYS - WILL RE-INSPECT ON 7/18
NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION AND NOTIFICATION OF ADEQ. |
| 06/26/2013 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SOME SEDIMENT CONTROLS IN PLACE
MAY NEED TO ADD SUPLEMENTAL CONTROLS DUE TO THE FACT THAT SOIL IS BEING TRACKED ALL OVER ADJACENT STREETS AND AREAS OF THE PERIMETER ARE NOT BEING PROTECTED
2) SWEEP UP TRACKED SOIL MORE OFTEN |