Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP13-0012

Parcel: 10603148A


Addresses:

125 W YAVAPAI RD

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
01/22/2014 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/11/2013 ENGR Grading Final DROBERTS Partial Approval Entered by DROBERT5 - PROVIDE APPROVED DRAWINGS FOR MIKE TOO VERIFY ON 9/16/2013.
07/11/2013 ENGR Grading Final MRUSSO Partial Approval Entered by DROBERT5 - REVISION OF BUBBLER AND DRAINAGE INTO EXISTING CHANNEL, NO APPROVED PLANS YET
09/11/2013 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/11/2013 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
09/11/2013 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
08/16/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - DRAINAGE CHANNEL CROSSING COMPLETED. ADD RAILING TO CROSSING CALL FOR RE-INSPECTION
07/26/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
07/25/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - FOLLOW UP INSPECTION PICTURES TAKEN OF INSTALLED STORM WATER PIPING AND CROSSING. PICTURES TAKEN
07/11/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) A SWPPP HAS BEEN DEVELOPED AND IMPLEMENTED. 2) AN NOI HAS BEEN POSTED ON SITE 3) SEDIEMNT CONTROLS HAVE BEEN INSTALLED AND WILL BE INSPECTED AND MAINTAINED 4) A CONCRETE/ MATERIALS WASH WILL BE USED ON SITE 5) ADD SEDIMENT CONTROLS AROUND THE EXISTING BATCH PLANT ON SITE 6) CALL FOR INSPECTION FOR CONSTRUCTION OF DRAINAGE CHANNEL CROSSING AT EAST SIDE OF SITE 7) REVISION OF BUBBLER AND DRAINAGE INTO EXISTING CHANNEL, NO APPROVED PLANS YET
07/10/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) THE CONTRACTOR ON SITE NEEDS TO PROVIDE A SWPPP 2) CONTRACTOR HAS INSTALLED SEDIMENT CONTROLS 3) CONTRACTOR NEEDS TO POST A SIGNED COPY OF THE NOI AT THE ENTRANCE TO THE SITE 4) CONTRACTOR NEEDS TO PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS 5) A CONCRETE/MATERIALS WASH MUST BE USED 6) MAY NEED TO ADD SEDIMENT CONTROLS TO EXISTING 7) CALL FOR INSPECTION PRIOR TO COVERING THE DRAINAGE INSTALL INTO THE MAIN CHANNEL
06/27/2013 ENGR Grading Final MRUSSO Correction Required Entered by DROBERT5 - 1) CHANGES MADE TO STORM WATER DRAINAGE SHOWN ON APPROVED GRADING PLAN, MUST BE REVISED AND SHOWN ON AN APPROVED PLAN. 2) INSPECTION MADE OF 18" CMP TIE-IN TO EXISTING 36" CMP OK TO COVER, PICS TAKEN 3) NEED TO INSPECT INSTALL OF SRP PER APPROVED PLANM - CALL FOR INSP 4) PRIOR TO FINAL APPROVAL , PROVIDE A REVISED PLAN SHOWING CHANGES MADE FOR THE FINAL INSP. PROVIDE AN AS-BUILT. PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD
06/07/2013 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME