Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP13-0012

Parcel: 10603148A


Addresses:

125 W YAVAPAI RD

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
09/11/2013 SITE - Stormwater Follow-up DROBERTS Approved Entered by DROBERT5 - NO CONCERNS, SITE READY TO BE CLOSED AT THIS TIME.
08/16/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/25/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
07/11/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) A SWPPP HAS BEEN DEVELOPED AND IMPLEMENTED. 2) AN NOI HAS BEEN POSTED ON SITE 3) SEDIEMNT CONTROLS HAVE BEEN INSTALLED AND WILL BE INSPECTED AND MAINTAINED 4) A CONCRETE/ MATERIALS WASH WILL BE USED ON SITE 5) ADD SEDIMENT CONTROLS AROUND THE EXISTING BATCH PLANT ON SITE 6) CALL FOR INSPECTION FOR CONSTRUCTION OF DRAINAGE CHANNEL CROSSING AT EAST SIDE OF SITE
07/10/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) THE CONTRACTOR ON SITE NEEDS TO PROVIDE A SWPPP 2) CONTRACTOR HAS INSTALLED SEDIMENT CONTROLS 3) CONTRACTOR NEEDS TO POST A SIGNED COPY OF THE NOI AT THE ENTRANCE TO THE SITE 4) CONTRACTOR NEEDS TO PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS 5) A CONCRETE/MATERIALS WASH MUST BE USED 6) MAY NEED TO ADD SEDIMENT CONTROLS TO EXISTING 7) CALL FOR INSPECTION PRIOR TO COVERING THE DRAINAGE INSTALL INTO THE MAIN CHANNEL
06/27/2013 SITE - Stormwater Follow-up MRUSSO Correction Required Entered by DROBERT5 - 1) DISTURBED AREA OF SITE IS > 1AC, THEREFORE A STORM WATER PERMIT AND PLAN IS REQUIRED 2) GET AN NOI FROM ADEQ 3) POST A COPY OF THE NOI AT THE ENTRANCES OF THE SITE 4) DEVELOP A SWPPP FOR YOUR SITE 5) IMPLEMENT THE SWPPP, INSTALL SEDIMENT CONTROLS PER THE SWPPP AND CALL FOR INSPECTION 6) PROVIDE A CONCRETE/ MATERIALS WASH OUT ON SITE AND USE IT 7) PERFORM STORM WATER SELF INSPECTIONS EVERY 14 DAY AND/OR AFTER A SIGNIFICANT RAIN EVENT, AND DOCUMENT THEM 8) INSTALL STABILIZED CONSTRUCTION ENTRANCES/EXITS AS NEEDED 9) SWEEP UP TRACKED SOIL AS NEEDED 10) CLEAN OUT ALL EXISTING AND ANY NEW CATCH BASINS PRIOR TO FINAL APPROVAL
06/07/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND OR CONCERNS AT THIS TIME
04/25/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - SEDIMENT CONTROLS HAVE BEEN INSTALLED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME