Inspection Status: Passed

Inspection History: SITE - SWPPP Correction Notice

Permit Number - DP12-0198

Inspection Description - SITE - SWPPP Correction Notice

Inspection Status - Passed

Date Description Inspector Results Comments
04/25/2017 SITE - SWPPP Correction Notice DROBERTS Approved Entered by DROBERT5 -
07/22/2013 SITE - SWPPP Correction Notice MRUSSO Continued Entered by DROBERT5 - 1) PERIMETER SEDIMENT CONTROLS HAVE BEEN REPAIRED/REPLACED AS NEEDED 2) EROSION DAMAGEFROM STORM WATER RUN-OFF HAS BEEN REPAIRED. 3) ROUTINE MAINTENANCE OF STORM WATER CONTROLS IS REQUIRED THROUGHOUT CONSTRUCTION, UNTIL THE SITE IS STABILIZED. 4) RE-DEFINE/RE-ESTABLISH THE TEMP SWALE (TO INCLUDE COMPACTION) ALONG THE WEST BOUNDRY OF THE NORTH PROPERTY AND IN ALL AREAS WHERE IT IS USED ALONG THE SOUTH PROPERTY. 5) SWEEP UP TRACKED SOIL OFF MARY ANN CLEVELAND ROUTINELY 6) CONTRACTOR CONSTRUCTING INDIVIDUAL LOTS AND ROADWAYS, BLOCK WALLS AND A BRIDGE/CROSSING AT THE ENTRANCE TO THE NORTH PROPERTY.
07/09/2013 SITE - SWPPP Correction Notice MRUSSO Correction Required Entered by DROBERT5 - 1) INSPECTION OF SITE PERIMETER SHOWED DAMAGE TO ALL EXISTING SEDIMENT CONTROLS. CONTRACTOR MUST RE-ESTABLISH, REPAIR, AND/OR REPLACE SEDIMENT CONTROLS IN ALL AREAS OF DAMAGE. 2) SOME EROSION DAMAGE TO SIDE SLOPES ALONG THE NORTH AND WEST SIDES OF THE SITE. 3) PICTURES TAKEN OF DAMAGED CAUSED BY MONSOON RAINS 4) BRING DISCHARGED SOIL BACK ONTO SITE 5) CALL FOR RE-INSPECTION WHEN REPAIRS ARE COMPLETE.