Permit: DP12-0103

Parcel: 141185240


Addresses:

9398 E OLD VAIL RD

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
09/17/2013 SITE - Stormwater Follow-up MRUSSO Approved Entered by DROBERT5 -
08/28/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - SITE HAS BEEN PAVED. LANDSCAPING BEING DONE. MAJORITY OF SITE HAS BEEN STABILIZED. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
08/19/2013 SITE - Stormwater Follow-up MRUSSO Partial Approval Entered by DROBERT5 - SITE HAS BEEN PAVED, HOWEVER ALL AREAS HAVE NOT BEEN LANDSCAPED OR HARDSCAPED. STILL NEE SEDIMENT CONTROLS IN THOSE AREAS
08/16/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - CONTRACTOR PAVING SITE, MAJORITY OF SEDIMENT CONTROLS HAVE BEEN REMOVED. ENSURE STORM WATER PLAN IS IMPLEMENTED UNTIL THE SITE IS 100% STABILIZED
07/26/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR INSTALLING CURB IN PARKING AND ACCESS AREA. 2) CONTRACTOR PREPING SUB-GRADE FOR PAVING 3)NEED TO RE-INSTALL/REPAIR/REPLACE SILT FENCE ALONG SOUTH EAST SIDE OF SITE. 4) CALL FOR INSPECTION PRIOR TO INSTALL OF STORM PIPE
07/15/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME
06/27/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) INSTALL OF 280LF OF 8" HDPE GRADED @ 1% 2) INSTALL OF 8X8" TEE CONNECTION FOR LATERAL LINE 3) PIPE WILL BE BEDDED AND COVERED W/ SCREENED MATERIAL 4) CALL FOR INSPECTION WHEN CATCH BASINS ARE FORMED PRIOR TO COVER 5) PICTURES TAKEN FOR VERIFICATION/DOCUMENTATION OK TO BURY PIPE 6) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
06/24/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
06/06/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - CONTRACTOR STATED THAT THE STORM PIPING SHOWN ON THE APPROVED PLANS WILL BE INSTALLED NEXT WEEK. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
04/22/2013 SITE - Stormwater Follow-up MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS IN PLACE 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 3) SITE BEING INSPECTED BY ADEQ 4) CONTRACTOR WORKING ON FOUNDATION AND STEM WALLS, NO SIGNIFICANT SITE WORK AT THIS TIME