Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/20/2012 |
PDSD Engineering Division Pre-Construction SITE |
RLEDONNE |
Approved |
Entered by RLEDONN1 - |
| 09/18/2012 |
PDSD Engineering Division Pre-Construction SITE |
jgreen |
Continued |
Entered by JGREEN2 - This project is proposing 2 columns for the drive thru canopy that are to be constructed adjacent to an existing concrete lined channel. Inspector needs to make sure that the construction of these columns do not cause adverse damage to the lined channel during constructing and that no sediment or debri is being added tot he wash. JG |