Inspection History: COT - ENFC - Code Enforcement - Follow Up
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2025 | COT - ENFC - Code Enforcement - Follow Up | Passed | Contractor still working with PDSD on permits. | |
| 07/21/2025 | COT - ENFC - Code Enforcement - Follow Up | Passed | Contractor completed the permitting process for the Fire Dept permit requirement(TF-FCP-1024-00894 & TF-FCP-1024-01200). Next step... Contractor must obtain a combo permit for the propane tank from PDSD. | |
| 03/11/2025 | COT - ENFC - Code Enforcement - Follow Up | Passed | Called Contractor regarding the status of the 3rd permit. Currently do not see the Combo permit for the Propane Tank. Last permit applied for the propane tank was withdrawn in 2017. | |
| 09/04/2025 | COT - ENFC - Code Enforcement - Follow Up | Passed | PERMITS COMPLETE. CLOSE CASE | |
| 07/21/2025 | COT - ENFC - Code Enforcement - Follow Up | Passed | Contacted PDSD and TFD regarding the issue with the propane tanks. Inquired specifically about permits required. 3 types of permits are required for the propane tank that was installed. 1) TFD - construction permit for propane tank over 2000 gal 2) TFD - Operations of compressed gas 3) PDSD - Large gas tank bldg permit required. Owner installed the propane tank approximately 2017. |
|
| 07/21/2025 | COT - ENFC - Code Enforcement - Follow Up | Passed | Owner hired Ferral Gas to obtain all permits for the tanks installed on commercial property. Ferral Gas currently working with TFD and PDSD to obtain all permits required for the tank. |