Inspection Details
Inspection Details
| Date | Description | Inspector | Status | Comments |
|---|---|---|---|---|
| COT - HCBU - Framing | Partial Pass | 6/9/26: Shaft # 8 3rd-4th floor (fire tape), shaft (#4,5,6,7,8,9) 3rd-6th floor (fire tape), rooms (372,472,572,672,772,373,573,773) fire tape, elec room (376,476,576,676,776) 2nd layer, shaft # 4 and 5 floors 3-6 |