Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Details
| Date |
Description |
Inspector |
Status |
Comments |
|
COT - HCEL - Electrical Final |
|
Re-inspection required |
11/4/26: 14th floor corridor + electrical/storage rooms final walk:
Existing Electrical room -
1. Identify Romex line in existing panel
2. Mark existing electrical panel schedule
West mechanical room -
1. Clamps on unistrut above fan coil
2. HVAC refrigerant line supports
3. Conduit supports
4. Verify and label breaker for disconnect
5. Tie in overflow switch on fan coil
IDF room -
1. Supports on conduits within 3'
2. Remove low voltage from fire sprinkler pipe
Elevator lobby Electrical -
1. Mc clamps
2. Mark electrical panel
3. Clamps off of light
Janitors closet -
1. Clamp temporary water lines
East Main Electrical room -
1. MC clamps
2. Verify disconnect
3. Remove unused conduit
East Existing Electrical room -
1. Replace knockouts on box
2. Relabel panel schedule |