Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Details
| Date |
Description |
Inspector |
Status |
Comments |
| 08/25/2023 |
COT - ENFC - Code Enforcement - Initial |
|
Scheduled |
I REVISITED THE SITE, MET WITH THE OCCUPANT WHO WAS SPANISH SPEAKING ONLY. WE COMMUNICATED ENOUGH TO CONDUCT THE INSPECTION . I FOUND THAT THE COOLER ON THE ROOF WAS LEAKING, THEN WATER WENT INTO THE BATHROOM, FOUND THE SUB-FLOORING WAS DETERIORATED AND FLOOR COVERING COMING UP, THERE WAS ALSO WATER DAMAGE TO THE BATHROOM CEILING AND TOILET WAS LOOSE AND ROCKING. THERE WAS POSSIBLE WATER DAMAGE TO THE HALLWAY CEILING THE TILE CEILING LOOKED AS IF IT WAS PAINTED BUT NOT WATER DAMAGE AT AT THE TIME OF INSPECTION. SHE THEN SHOWED ME INSIDE THE BEDROOM, THERE WAS A PIECE OF PANELING APPROX 10-12 INCHES IN LENGTH THAT WAS PULLING AWAY FROM THE WALL THAT COULD BE EASILY RENAILED AND THEN PIECE OF CEILING TILE NOT EVEN NEAR THE ROOF LEAK THAT WAS COMING APART. WHEN I COMPLETED THE INSPECTION I CONTACTED THE OFFICE MANAGER WHO INFORMED ME THAT THEY NEVER RECEIVED A CALL FROM THE OCCUPANT ABOUT THE REPAIR ISSUES.THE MANAGER STATED IT WAS TOO LATE IN THE DAY TO GET OUT THERE BUT STATED BECAUSE OF THE RECENT RAINS WOULD BE OUT TOMORROW (SATURDAY) AND TAKE CARE OF ALL ISSUES.). THE FOLLOWING MONDAY 8/28 I RECEIVED A CALL FROM THE MANAGER STATING THAT THE COOLER HAD BEEN LEAKING, IT WAS REMOVED FROM THE ROOF, REPAIRS WERE MADE TO THE SUPPORTS AROUND THE DUCT WORK, RESEALED THE AREA, PATCHED AND RECOATED THE ROOF. THE COOLER WAS REINSTALLED WITH NEW PADS AND A PUMP AND GOOD WORKING CONDITION. REPAIRS TO THE BATHROOM HAD BEEN STARTED. A NOV WAS NOT ISSUED BECAUSE ROOF REPAIRS COMPLETED QUICKLY AND THE ROOF WAS DRYED IN AND BATHROOM REPAIRS UNDER WAY. |