Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

Closed - Resolved

Type:

MULT - MOBILE HOME #A36 - Active leak in restroom, toilet and walls are wet in restroom, cooler lots of water leaking worried about electrical

Entered Date:

08/21/2023

Applicant:

N/A

Description:

Completed Inspections

Case Status: Closed - Resolved
Case Number: CE-VIO0823-05180
Case Description: MULT - MOBILE HOME #A36 - Active leak in restroom, toilet and walls are wet in restroom, cooler lots of water leaking worried about electrical
Total Completed Inspections - 1
End Date Description Inspector Results Comments
09/07/2023 COT - ENFC - Code Enforcement - Follow Up Passed ON THURSDAY 9/07 I RECEIVED A 2ND CALL AND PICTURES FROM THE MANAGER SHOWING THAT BATHROOM CEILING TOILET WALL DRYWALL HAD BEEN REPLACED, ,TAPED,TEXTURED AND PAINTED. THE TOILET WAS REMOVED, BATHROOM SUB-FLOORING REPAIRED, NEW VINYL TILE WAS INSTALLED AND TOILET RESET AND CAULKED. ATER RECEIVING THE INFORMATION I HAD C/E SPANISH SPEAKING OFFICE MANAGER CONTACT THE OCCUPANT AND SHE VERIFIED THAT ALL REPAIRS HAD BEEN COMPLETED. THERE ARE NO FURTHER ISSUES. COMPLIANCE / CLOSE CASE.

Scheduled Inspections

SCase Number - CE-VIO0823-05180
Case Status: Closed - Resolved
Case Description:
Scheduled Date Description Inspector Status
11/07/2023 COT - ENFC - Code Enforcement - Initial Scheduled
11/07/2023 COT - ENFC - Code Enforcement - Initial Scheduled