Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

RES: MINIMUM HOUSING
Address:

Entered Date:

09/13/2022

Applicant:

KHONDOKER S SALOM

Description:

Raw sewage from building running along eastside if building south towards back of property all in parking lot

Outstanding Inspections

Case Number: T22DV05290
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
INSP - FOLLOW UP CODE ENFORCE None Not Inspected

Completed Inspections

Case Status: COMPLIAN
Case Number: T22DV05290
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 1
End Date Description Inspector Results Comments
09/14/2022 INSP - INITIAL CODE ENFORCMENT GOODMAN Approved VISITED SITE, MET WITH OWNER OF ROBERT ZIPADA MANAGEMENT LLC WHO STATED THERE IS A EVENT CENTER IN THE S/W PORTION OF THE PROPERTY. THERE WAS A QUINCENIERRA ON SAT 9/11 WHEN THE SEWER BACKED UP. THE SEWER LINE RUNS FROM THE EVENT CENTER TO OLD LIFT CENTER WERE SOLID WASTE IS REMOVED FROM THE SEWER LINE IN A BASKET FROM THE LIFT CENTER. THE PUMPS HAD GONE OUT THAT NIGHT, THE CLOSEST CLEAN OUT WAS 350 FT AWAY. OWNERS WENT TO BOTH PDSD AND PIMA COUNT TO DETERMINE WHERE THE CLOSET CLEAN OUT WOULD BE AND HOW TO REMEDY THE BACK UP. PIMA COUNTY DETERMINED THAT CHANGING THE SEWER LINE WOULD BE COSTLY, SUGGESTED REPLACEING THE PUMPS WITH A PUMB THAT HAS A GRINDER AT THE BOTTOM OF THE PUMP SO THAT INSTEAD OR REMOVING SOLID WASTE FROM THE BASKET, THE GRINDERS WOULD GRIND UP THE SOLID WASTE AND ALLOW THAT TO FLOW THRU THE 4 IN LINE AND REMOVING THE BASKETS AND WASTE WOULD NOT BE REQUIRED. BOTH PUMPS HAVE ALREADY BEEN ORDERED, SUPPLIER STATED THEY ARE NOT SURE HOW LONG IT WILL TAKE TO GET THEM, BUT WILL CONTACT WHEN THEY ARRIVE. MAINTANENCE STATED THE NEXT EVENT IS SCHEDULED FOR OCT 30TH AND HOPES THAT WILL GIVE THEM PLENTY OF TIME TO REPLACE THE PUMPS. THE PARKING AREA HAS BEEN CLEARED OF ANY WASTE, BLEACHED AND SPRAYED WITH WATER TO CLEAN THE AFFECTED AREA. THERE ARE NO SIGNS OF SEWER BACK UP. THERE IS A LIFT THAT REMOVES THE TOP OF THE 3 FT CLEAN OUT, TOP IS VERY HEAVY, LIFT WILL ALSO BE USED TO REMOVE AND REPLACE THE 2 CAST IRON PUMPS AND THEN IS A MATTER OF REWIRING THE PUMPS. WORK IS IN PROGRESS, PUMPS HAVE BEEN ORDERED, EVENT CENTER NOT BEING USED UNTIL OCTOBER 30TH. COMPLIANCE / CLOSE CASE.