Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T21DV08130
Case Details
Entered Date:
11/15/2021
Applicant:
ALVERNON MANOR LLC
Description:
ongoing issue of sewage flow from a clean out on the southside of the building flowing east from the drive-way onto Alvernon HY
Completed Inspections
Case Status: COMPLIAN
Case Number: T21DV08130
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2021 | INSP - INITIAL CODE ENFORCMENT | GOODMAN | Approved | VISITED SITE, MET WITH MAINTANENCE FIRST WHO EXPLAINED THE BACK UP WAS FIRST CALLED IN ON FRIDAY 11/12 BUT WAS SNAKED BY THE MAINTANENCE DEPT FOR THE COMPLEX ON FRIDAY AND AGAIN TODAY. UPON MY ARRIVAL THE SEWER LINE HAD BEEN SNAKED AND CLEAN UP COMPLETED. THE MAINTANENCE PERSON HAD THE HOSE RUNNING INTO THE SEWER LINE WITH NO BACK UPS. I KNOCKED ON DOOR OF UNIT 10, OCCUPANT ALLOWED ENTRY AND I CHECKED THE SINKS TOILET AND TUB, EVERYTHING DRAINED JUST FINE. UNIT #9 WAS UNAVAILABLE AND UNIT 8 STATED EVERYTHING WAS DRAINING FINE. PROPERTY MANAGER STATED SILVERADO PLUMING WILL BE COMING TOMORROW 11/16 TO SCOPE AND POWER JET THE SEWER LINE. I CONTACTED AND CONFIRMED WITH SILVERADO PLUMBING THAT THEY WOULD BE THERE TOMORROW BETWEEN 8 AND 2, WOULD INCLUDE ANY DAMAGED PIPE THAT NEEDED REPLACEMENT AND COST SO IF NEEDED A NOV COULD BE ISSUED. I WAS LATER CONTACTED BY PIMA COUNTY HEALTH SHE WAS ON SITE AND AGREED WORK WAS IN PROGRESS BUT ASKED IF I COULD MEET HER AGAIN TOMORROW AS PCHD HAS HAD MANY LIKE ISSUES ON THE PROPRETY AND WANTS TO POSSIBLEY MEET ON PAST ISSUES IN CASE A NOV NEEDS TO BE ISSUED. WORK IS IN PROGRESS, NOV WAS NOT ISSUED PENDING SCOPE BY SILVERADO PLUMBING AND WILL WITH MEET PCHD. |
11/16/2021 | INSP - FOLLOW UP CODE ENFORCE | GOODMAN | Approved | REVISITED SITE, MET WITH PIMA COUNTY HEALTH INSPECTOR WHO HAS BEEN OUT TO THE COMPLEX SEVERAL TIMES FOR THE SAME TYPE ISSUES. I EXPLAINED WHAT MY INSPECTION FOUND THE PREVIOUS DAY AND INFORMED HER THAT I DID NOT ISSUE A NOV DUE TO WORK IN PROGRESS. SIVERADO PLUMBING DID ARRIVE ON THE PROPERTY AROUND 9:30 - 10. HE EXPLAINED THAT HE WOULD SCOPE THE SEWER LINE (LONG RUN ALONG THE SOUTH SIDE OF COMPLEX) AND THEN HYDRO JET THE LINE TO CLEAN IT OUT. ANY ADDITIONAL ISSUES WOULD BE PLACED ON THE INVOICE WITH A COST THAT MANAGEMENT WOULD NEED TO DECIDE WHETHER THE WORK WAS TO BE DONE BY SILVERADO OR ANOTHER CONTRACTOR. ALL ISSUES WERE ADDRESSED. SEWER LINE IS NOW MOVING WASTE. NOV WAS NOT REQUIRED. COMPLIANCE / CLOSE CASE. |