Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T21DV08130

Parcel: 12511162C


Addresses:

919 N ALVERNON WY


Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Case Number - T21DV08130

Inspection Description - INSP - INITIAL CODE ENFORCMENT

Inspection Status - Approved

Date Description Inspector Results Comments
11/15/2021 INSP - INITIAL CODE ENFORCMENT Approved VISITED SITE, MET WITH MAINTANENCE FIRST WHO EXPLAINED THE BACK UP WAS FIRST CALLED IN ON FRIDAY 11/12 BUT WAS SNAKED BY THE MAINTANENCE DEPT FOR THE COMPLEX ON FRIDAY AND AGAIN TODAY. UPON MY ARRIVAL THE SEWER LINE HAD BEEN SNAKED AND CLEAN UP COMPLETED. THE MAINTANENCE PERSON HAD THE HOSE RUNNING INTO THE SEWER LINE WITH NO BACK UPS. I KNOCKED ON DOOR OF UNIT 10, OCCUPANT ALLOWED ENTRY AND I CHECKED THE SINKS TOILET AND TUB, EVERYTHING DRAINED JUST FINE. UNIT #9 WAS UNAVAILABLE AND UNIT 8 STATED EVERYTHING WAS DRAINING FINE. PROPERTY MANAGER STATED SILVERADO PLUMING WILL BE COMING TOMORROW 11/16 TO SCOPE AND POWER JET THE SEWER LINE. I CONTACTED AND CONFIRMED WITH SILVERADO PLUMBING THAT THEY WOULD BE THERE TOMORROW BETWEEN 8 AND 2, WOULD INCLUDE ANY DAMAGED PIPE THAT NEEDED REPLACEMENT AND COST SO IF NEEDED A NOV COULD BE ISSUED. I WAS LATER CONTACTED BY PIMA COUNTY HEALTH SHE WAS ON SITE AND AGREED WORK WAS IN PROGRESS BUT ASKED IF I COULD MEET HER AGAIN TOMORROW AS PCHD HAS HAD MANY LIKE ISSUES ON THE PROPRETY AND WANTS TO POSSIBLEY MEET ON PAST ISSUES IN CASE A NOV NEEDS TO BE ISSUED. WORK IS IN PROGRESS, NOV WAS NOT ISSUED PENDING SCOPE BY SILVERADO PLUMBING AND WILL WITH MEET PCHD.