Case: T21DV01870
Case Details
Entered Date:
04/06/2021
Applicant:
JOSE B LANDY & VIRGINIA S TAPIA JT/RS
Description:
Hazardous construction work, they already hit underground cables, and they have left all pipes exposed, and water meter was not cover with its lid exposing a hazardous hole, trenches may not be up to code, very sloppy construction site, we are wondering if they even have permits for construction
Outstanding Inspections
Case Number: T21DV01870
Case Status: COMPLIAN
Case Description: PROP MAINT MULTIPLE TYPES
Total Outstanding Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| INSP - FOLLOW UP CODE ENFORCE | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T21DV01870
Case Description: PROP MAINT MULTIPLE TYPES
Total Completed Inspections - 1
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2021 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | The property has a house being built and has the concrete floor just poured. Has a opened trench by the meter location for the water with the pipe set in the trench with the wire and ready to be covered. Did talk to the owner and the meter is not installed yet and waiting for the meter to be installed to make the connection to the meter. The owner will cover the trench or place something over the trench to cover the trench. The owner has the permit, T21CM02432 issued on 3-17-21 and the last inspection was on 4-1-21. At this time the case will be closed. Violation Abated, Close Case. RV. |